TLDR: It doesn't prevent strikes.
So I was visiting in London just as the strikes happened, and truth be told, I didn't find it so bad? Obviously it was slightly busier than normal, but it wasn't so crowded to the point of being unusuable. Maybe it's because with the Overground, Elizabeth Line and DLR still running as normal and taking some pressure off, but every time we get a strike, there's always talk of "Automate the tube!". Which is not happening, it never will happen, and it's a suggestion that has never been thought through well enough. I believe Jago Hazzard did a video on the matter on it some time ago, and many of his points in that are spot on. Although this is part of my analysis and research on the matter to the feasibility.
First and foremost, the whole discussion about preventing strikes is pointless anyway because trains still need staff on them regardless, not doing so can be a safety issue if something happens, which I'll get onto in a bit. That's what the DLR has, and their staff have gone on strike before. Theoretically the tube could do what the DLR does anyway, as most of the lines have automatic train operation (except the Bakerloo and Piccadilly but that'll change post 2024 stock). And even if the trains didn't have staff, the stations would, which you'd need to help guide passengers and respond to issues. Not to mention for example the strike on the Piccadilly Line earlier in the month which was for signalling staff, not drivers. So the whole thing is pointless discussing since the main aim of stopping strikes wouldn't even be achieved, but let's go through it anyway:
To actually fully automate the tube, you'd firstly need to near enough completely redesign the signalling system. That is not easy, and most importantly not cheap. The signalling upgrade planned for the Piccadilly Line alone is estimated to be about £3.4bn, and that's just one line. Imagine trying to do that, but for every line across a span of 10 years. I mean not only is that unfeasible, but that would cause more disruption to existing services than what any strike has ever done. So already that's not a great start, but that's just the bare minumum of actually getting there in the first place. If we're talking doing so in a safe manner, which failing to do so will result in lengthy and expensive court cases, then it gets much more problematic. Because most of the deep level tunnels were built in the early 20th century, they're not built to be evacuated from in the case of an emergency, especially unsupervised. See say the problems with evacuating during the 7/7 bombings. Now imagine something like that happens again, but passengers have no guide, no way around what to do on the train, and are left completely in the blank. Even in much less extreme scenarios, say a major signal failure happens or someone jumps in front of a train. How is that situation going to be solved if there's no one who is trained to take the initiative? Preventing the latter could be done with platform doors, but... that's going to add to the cost even more. Introducing them alongside the 2024 stock was already abandoned due to cost, so what would that look like on the whole network? Or how would it work on say the Bakerloo Line north of Queen's Park, or the Uxbridge branch? Or on the Central Line at Bank which has curved platforms? All of it combined makes it seem like you near enough have to build the entire network up again from the ground up, from tunnels, to signalling, to stations, to trains, which would cause unprecedented disruption across the network, far more than any strike out there, and more importantly, would cost an extreme amount of money.
On the topic of money, how much would it actually cost? The closest figure I could find online was that automating just the Central, Bakerloo (pre extension) and Piccadilly Line alone would cost £20bn. That's twice the budget for the Bakerloo Line Extension and near enough the same figure that the Elizabeth Line cost. And that's purely the functional basics, let alone matching a lot of the safety and legal requirements. Adding for all lines, the expected loss revenue for disrupted service, and these further requirements mean the the final budget would probably end up at over £100bn, or more than HS2's already massively overran budget. But high costs isn't necessarily a bad thing if the return is of value, so is it? The Elizabeth Line cost a fortune, but it introduced journeys to the network, took pressure off main lines, and has become one of the most successful and busiest railways in the UK. The Bakerloo Line Extension as an example is due to open up rail transport to a place that has badly needed it for years, and allows further development. The new trains for the 2024 stock helps improve the reliability of the service, improves the passenger experience, and makes maintenance easier and cheaper in the long run as opposed to keeping old stock. And HS2 opens up new intercity service opportunities and allows for an increase of capacity on the existing railways too. So... what does full automation actually achieve for the price it's worth? I don't think I've ever actually seen an argument in support of automation besides preventing strikes (which it wouldn't do anyway), and that's because... there really aren't any, especially for the high price point. It doesn't make the service quicker, it doesn't improve the direct passenger experience, it doesn't make it safer, it doesn't increase capacity, it doesn't create journeys or improve existing ones or reach places poorly served by public transport. It does near enough nothing.
Furthermore, as with any infrastructure project, the ever ending question of how it would be paid for, or rather who will pay for it, will get asked. Many London railway projects were partially funded by new development, such as the Battersea extension or the Jubilee Line extension, which helped alieviate the cost that was needed to be injected by National government. But there is no development with this, meaning the cost would likely have to come out of the commuter's pocket. And let's just say trying to market this as a viable plan would become so much unpopular if you had to tell people that fares would drastically increase as a result.
In summary, it's drastically too expensive, it offers no benefit to the existing passenger, it doesn't introduce new passengers, and it doesn't even solve the annoying yet overall fairly minor inconvenience that caused its discussion in the first place. I would prefer we spend the money instead on projects that would actually help the network.