r/EnergyStorage • u/lgbtqismything • 19h ago
Batteries could cut Italy's electricity prices by almost half - study
r/EnergyStorage • u/lgbtqismything • 19h ago
r/EnergyStorage • u/Massive-Life-2316 • 11h ago
Purchased a 12V 200Ah LiFePO4 Battery 2560Wh Deep Cycle Lithium Battery 200A BMS. When it arrived it only showed .3v on the multimeter. I connected my LiTime 12V 60A Lithium Battery Charger for LiFePO4. The charger says it's full charged so I removed the charger and it still reads .3v. I tried running my car battery to it via jumper cables for 5 minutes still .3v.
Am I doing wrong to get this Battery running?
r/EnergyStorage • u/Severe-Ad8673 • 1d ago
When several voltage rails share a switched-capacitor converter, their loads can vary independently. This work establishes exactly how much extra charge-weighted capacitor plate motion a fixed circuit can incur compared with a circuit tailored to each load mixture.
For \(m\) independently loaded outputs, the sharp worst-placement factor is \(2-2/(m+1)\). The result covers common-ground converters with two fixed switching phases, rational rail ratios, a linear periodic charge response, and a sufficiently high nominal capacitor-voltage ceiling. A constructive synthesis attains the guarantee, and explicit families of rail placements approach the bound regardless of component count. Every individual placement with at least two outputs admits a strictly better factor. The included compiler checks \(m(m+1)/2\) extreme load directions and generates a capacitor network with exact phase-charge verification.
PureOne/Xhiorun-VIII-Volt-Omega · Datasets at Hugging Face
The release combines a circuit-independent performance bound with constructive synthesis, exact arithmetic, and reproducible circuit predictions. The mathematical objective measures nominal charge activity. The cross-regulation result concerns steady cycle means under constant loads. Hardware efficiency, transient isolation, and commercial savings remain to be established.
The full description includes the component values, the general multi-rail decoupling construction, the exponential tree-configuration result, and suggested keywords.
r/EnergyStorage • u/Stukwan • 1d ago
r/EnergyStorage • u/9bots • 1d ago
r/EnergyStorage • u/pierre_massonnat • 2d ago
r/EnergyStorage • u/Admirable-Size-4951 • 3d ago
r/EnergyStorage • u/solarfarmhub17 • 4d ago
Hi everyone,
I'm looking for reliable websites or databases that track utility-scale Battery Energy Storage System (BESS) projects around the world. I'm particularly interested in information such as project capacity, location, developer, EPC contractor, commissioning status, and project updates.
Which resources do you recommend?
Thanks in advance!
r/EnergyStorage • u/Stacyyirich • 4d ago
Disclosing upfront: I'm a recruiter on this role, not the hiring company. I'll name the client before you invest time in a process.
**Comp:** £80–100k base, plus bonus on top (structure confirmed on first call). Local European employment contract — pay currency depends on your country of hire.
**The role**
Account Representative for ground-mount PV and battery storage, covering Europe. Location flexible depending on where you're based. Full-time. You'd be selling into utilities, industrial plant owners and EPCs.
**What you'd own**
· Client relationships with utilities, industrial owners and EPCs in your region
· The full cycle: lead generation, proposals, negotiation, closing
· Market and competitor intelligence for ground-mount PV and BESS
· Working alongside solution and field engineers to deliver what you sold
· Payment collection and receivables — this role owns its cash flow
· Regular reporting on pipeline and market shifts
**What they need**
· Bachelor's degree (electrical, energy, business or similar)
· 3+ years selling or managing accounts in ground-mount PV, storage or renewables, with projects you actually won **in Europe** — not adjacent markets
· Working knowledge of local policy, grid connection and regulatory rules in your region
· Fluent English. German, French or Spanish is a genuine plus
· Frequent travel across the region
**Still open, and I'll get answers before you go deep:** visa/work-permit support, and whether they require existing EU right-to-work.
Being straight on the filter: 3+ years plus named European project wins is the hard line. Residential-only or component-supplier backgrounds usually don't clear it — that's not gatekeeping, it's saving us both a call.
DM me a 3–5 line summary: region, what you sold, typical deal size, languages. I reply either way.
r/EnergyStorage • u/No_Panda9497 • 5d ago
Hello,
Regarding the EU’s requirement for digital battery passports, which comes into force on 18 February 2027, do you have any idea exactly how and where these passports will be created, and how the information will be compiled within the passport itself? Have you already started preparing for their creation? Please could you provide some information?
r/EnergyStorage • u/youcefkadi12345 • 6d ago
Hello, I wanted to get some of your opinions on a project idea related to energy, as it works like a portable battery relying on several sources including solar, kinetic, pressure, and sound energy, playing a role in charging the battery. The primary sources are solar energy and pressure, while sound has a secondary role with a small amount of power, and kinetic energy kicks in when the others fail by spinning a motor to generate energy. To ensure the battery works without damage, there will be two of the same model to guarantee good performance and avoid pressure on the battery. Also, there will be diodes and fuses to cut off the current in case of a fault, and an external insulated casing to ensure safety, with the primary goal of charging a phone or a small device. I hope to get your thoughts on this.
r/EnergyStorage • u/ceph2apod • 7d ago
CAES facility is 300 MW/1,800 MWh and has an 8-hour charging cycle, with 6 hours of continuous discharge.The 300 MW/1.8 GWh project uses excavated hard-rock chambers, expanding compressed-air storage options beyond natural salt caverns.
Cost $368 million! Wow!
13 CAES projects are under construction, totaling 4.95 GW/23.95 GWh!
r/EnergyStorage • u/Vailhem • 8d ago
r/EnergyStorage • u/sloperator_ • 8d ago
Cross-posting if anyone has any thoughts / advice / guidance
r/EnergyStorage • u/Cheap_Concept754 • 9d ago
r/EnergyStorage • u/Vegetable_Day_6786 • 10d ago
During Q3, utility-scale storage deployment was led by Texas (12.3 GWh), Arizona (7.7 GWh), and California (6.8 GWh). But gains are growing throughout the country—so far this year, 11 states have beat their annual records for storage installation.
r/EnergyStorage • u/Cool-Cartographer765 • 9d ago
Я из России мне десять лет и я хочу показать концепцию нового аккумулятора на основе титана и алюминия (не готовая схема просто концепция)
Титан соприкасается с раствором хлорида титана вот реакцияTi-Ti4+ +4e- и также с алюминием Al-Al3+ +3e-
А также между электролитами и пластинами катионообменная мембрана (CEM)
Прошу не химиков или тех кто разбирается в аккумуляторах сказать в комментариях насколько эта идея возможно в реальности?
r/EnergyStorage • u/Lina314121 • 10d ago
Two suppliers quote a 100 kWh battery system. One means nominal DC battery energy; the other describes usable energy at an AC connection point. Comparing the headline numbers can leave an installer accepting a different deliverable from the one the customer expected.
Disclosure: I work with EITAI, a storage-battery manufacturer and inverter distributor. This is a procurement discussion, not a claim about a particular product.
I would resolve three things before comparing quotations.
Ask whether the quoted figure is nominal DC energy, usable DC energy within the permitted operating limits, or usable AC energy. For an AC figure, identify the meter location and whether auxiliary consumption is included.
Illustrative arithmetic only: assume a fictional 100 kWh nominal system provides 90 kWh of usable DC energy under the agreed conditions. With an assumed 95% discharge-path efficiency, that becomes 85.5 kWh AC. If 2 kWh of auxiliary consumption must also be deducted within that measurement boundary, net delivery becomes 83.5 kWh.
Those are invented assumptions, not EITAI specifications or recommended settings. Real usable energy needs model-specific evidence. If a supplier already states net usable AC energy under those conditions, do not apply the same deductions again.
2. Compare the operating conditions, not only the units.
Ask for the output power at which energy was established, temperature conditions, start/end criteria, battery age and applicable equipment configuration. A quantity in kWh without its conditions is a weak basis for accepting a specific delivery obligation.
Also separate discharge-path efficiency from round-trip efficiency. The latter accounts for energy going into and coming back out of the system; it should not automatically replace the one-way assumption in the example above.
3. Define the record that will close acceptance.
My proposed bid-comparison sheet would contain:
- Capacity definition and measurement point
- Auxiliary consumption included or excluded
- Required operating power and test conditions
- Source of the claimed usable-energy figure
- Agreed test procedure, responsible party and evidence to retain
- Treatment of interruptions, alarms and configuration changes
Have the responsible engineers agree the procedure within manufacturer instructions and local requirements. Do not improvise protection settings to reach a target figure.
For a distributor, a consistent definition helps make repeat orders comparable. For an EPC buyer, it helps connect the quotation to a measurable handover requirement. Commissioning evidence and ongoing performance monitoring have different purposes; one short demonstration does not establish lifetime performance.
Two useful references:
SAM's battery documentation distinguishes nominal and usable capacity, power-conversion losses and ancillary consumption:
https://samrepo.nlr.gov/help/battery_storage_btm.html
DOE/FEMP describes a method using metered charge/discharge history for operational performance assessment. Its long-term approach is not a substitute for a project-specific acceptance procedure:
https://www.energy.gov/cmei/femp/articles/battery-energy-storage-system-evaluation-method
For installers and procurement teams: which measurement boundary do you normally specify? And which missing definition has caused the most handover rework? Please keep customer details anonymous.
r/EnergyStorage • u/Torre1974 • 10d ago
r/EnergyStorage • u/factorialenergy • 10d ago
r/EnergyStorage • u/ceph2apod • 11d ago
"Deployment of storage capacity is outpacing existing policy targets. Storage additions hit a record 118 GW in 2025, including 108 GW of battery storage. If that pace were sustained through 2030 with no acceleration, energy storage would reach 1,020 GW, more than the sum of current national targets. Additions have been growing at almost 80% a year since 2020, which is much faster than the modest growth needed to hit the full 1,500 GW storage pledge. Storage additions are at least in part being driven by the dramatic declines in battery costs.
Countries with ambitious storage targets tend to have ambitious solar targets too. But several of the world’s biggest solar markets still have no 2030 storage target. Given the important role of storage in supporting renewables deployment, national storage targets can signal investment certainty and ensure grid stability." https://ember-energy.org/latest-insights/storage-target-ambition-is-rising-but-not-fast-enough-to-reach-the-goal/