r/NuclearPower • u/I_am_Takopipi • 4h ago
r/NuclearPower • u/Navynuke00 • Sep 02 '26
Nuclear Specialist Job Opening
careers-nrdc.icims.comThe Natural Resource Defense Council (NRDC) is looking for a Nuclear Specialist to work with their Science and Climate & Energy teams in Washington, DC
To support NRDC's advocacy, the Nuclear Specialist will conduct technical and policy analysis on nuclear energy issues including those related to complex reactor safety, radiation protection, and nuclear waste. Working within the Policy Analysis division in the Science Office and the Power division in Climate & Energy Department, the Nuclear Specialist will be a core staff member at NRDC for the institution’s engagement on nuclear power in the context of climate change. While NRDC prioritizes clean energy solutions including wind, solar, storage, efficiency and transmission, we recognize that nuclear power is zero-carbon generation and support its use in the right circumstances taking into account safety, community acceptance, and environmental impacts. The Specialist will contribute analysis and comments to federal and state regulatory proceedings, advise policymakers, and monitor nuclear developments to inform NRDC’s engagement.
r/NuclearPower
•
u/HairyPossibility
•
Mar 11 '26
Proximity to nuclear power plants associated with increased cancer mortality
hsph.harvard.edur/NuclearPower • u/Double-Power9992 • 1d ago
What do u think guys for the recent OPG NOIT assessment how much time they took for the next step of phone screening and how do u know that u went through the assessment aptitude test
r/NuclearPower • u/Striking-Fix7012 • 1d ago
Taishan Unit 3 Started Construction
world-nuclear-news.orgCGN announced the news a few days ago.
Taishan Unit 3 & 4 will be Chinese domestically designed HPR-1000s. Taishan Unit 1 & 2 are the world’s first EPRs, commissioned in 2018 and 2019.
Honestly, China should look into inland nuclear plants. I believe one already stated excavation works, but Fukushima halted everything back in 2011.
r/NuclearPower • u/fedecaccia • 3d ago
Global operable nuclear capacity reaches an all-time high of 401.2 GW across 443 reactors (Reactor Atlas data, Oct 2026)
I compiled worldwide operable nuclear capacity by year from the Reactor Atlas dataset (net capacity, data as of 13 October 2026).
The current total is 401.2 GW across 443 reactors, the highest ever recorded. The previous peak was 396.1 GW in 2018, with 447 reactors.
Between 1990 and 2015 capacity grew from 330.5 to 380.9 GW, about 50 GW in 25 years.
Between 2016 and 2026 China went from 31.6 to 60.9 GW, an increase of 29.3 GW. The world as a whole grew 11.3 GW net in the same period, as Germany (10.8 GW), Japan (8.3 GW) and Taiwan (5.1 GW) reduced capacity.
If the reactors under construction connect on their announced dates, capacity would reach 461.9 GW across 538 reactors in 2031, 15% above today. This projection does not subtract future closures.
Notes: "operable" includes temporarily stopped units, about 22 GW, mostly in Japan, which is the World Nuclear Association convention. Excluding them, the 2026 figure is about 379 GW. For units that entered commercial operation between 2016 and 2026, the median construction time was 8.6 years: 5.8 in China and 10.3 elsewhere.
r/NuclearPower • u/Entire-Charity2340 • 2d ago
atkinsrealis
anyone know about atkinsrealis electrical & Controls Field Service Technologist postion how that?
r/NuclearPower • u/Entire-Charity2340 • 2d ago
atkinsrealis electrical & Controls Field Service Technologist
Hi guys, anyone know, what they ask in AtkinsRealis electrical & Controls Field Service Technologist role and hows their to work?
r/NuclearPower • u/Necessary-Equal-3787 • 3d ago
Aecon permanent Project Coordinator vs Bruce Power contract position?
I’m starting a permanent Project Coordinator position with Aecon at the end of this month, but I also received an interview for a contract Project Coordinator role at Bruce Power.
I’m confused because I’ve been told Bruce Power contract positions are usually through companies like Tundra or Fermi. However, my interview came directly from Bruce Power HR and the technical interview is with the Bruce Power team. Is this normal? Does Bruce Power select you first and then hire you through a contract company?
If I get the offer, would you choose the permanent Aecon position or the Bruce Power contract position?
I’m early in my career, so even though the contract may pay much more, I’m wondering about job security, benefits, contract length, overtime, and the chances of extension.
r/NuclearPower • u/Organic_Drummer_697 • 3d ago
Did anyone receive the Bruce security clearance recently? Please share your timline. Thank you
r/NuclearPower • u/No-Direction2700 • 4d ago
POSS/C Test
Does anyone know what Duke Energy's qualifying POSS/C score is for Nuclear Operations? Specifically, is there a minimum required score for Mathematical Usage, or is the overall score what matters?
r/NuclearPower • u/LogicGate1010 • 5d ago
ITER vs SPARC vs TAE vs China: Who Gets Fusion First?
youtube.comr/NuclearPower • u/lyndalovon • 6d ago
Trump promise of hundreds of thousands of nuclear jobs doesn’t add up
alternet.orgr/NuclearPower • u/No-Two-9006 • 7d ago
Nuclear background check
I’m going to be doing the nuclear badging process relatively soon for unescorted access for a job offer I accepted.
Back in 2015 I was convicted of two battery charges the same day both misdemeanor.
Will this disqualify me from getting access then my job offer rescinded? My record has been clean since that conviction and I completed all the court ordered classes and such.
Thank you
r/NuclearPower • u/CharmingChicken338 • 7d ago
Why can’t a proven nuclear reactor design simply be built anywhere?
I came across an interesting point about how a proven reactor design can still need changes depending on where it is built.
Things like seismic conditions, cooling water, local regulations and the site itself can all affect the final design.
How much can these site-specific requirements change a reactor project in practice? And which site-related issue tends to be the most difficult to deal with?
r/NuclearPower • u/No-Boss9175 • 7d ago
Assessment for OPG
Has anyone got assessment for NOIT for OPG today. I just wanted to ask how is it and what do they check during assessment before starting it. Thank you in advance
r/NuclearPower • u/Striking-Fix7012 • 8d ago
TEPCO Postpones The Completion of K-K Unit 7 Anti-Terrorism Measures by One Year to Aug. 2030.
asahi.comThe new regulation stipulated by the Japanese NRA requires that every reactor that has been restarted must implement anti-terrorism measures, five years after the final NRA approval. K-K 7 remains in shutdown as that deadline was March 2025, but K-K 6 deadline is April 2029. Unit 6 is the sole unit that’s operating as of today.
Earlier this year. TEPCO agreed to send unit 1 and 2 into decomm, which is a prerequisite for obtaining local consent for restarting unit 6 and 7. In the future, unit 3 might also be decommissioned to pave the way for restarting unit 4 and 5.
r/NuclearPower • u/iheartfission • 8d ago
Nuclear Trivia Thursday Again.
What's the only Commercial Nuclear Power Plant on Route 66 in US?
Could be Palo Verde. Nope
Could be Wolf Creek. Nope
Could be Calloway. Nope
Could be Braidwood. Yup. If you drive down Route 66 in Braidwood, IL (now known as IL-53) you'll see the plant from the road.
r/NuclearPower • u/news-10 • 9d ago
Hochul unveils 5-gigawatt nuclear master plan for New York
news10.comr/NuclearPower • u/CharmingChicken338 • 9d ago
Why is building a nuclear plant so difficult even after the reactor design is proven?
Something I’ve been wondering about is how much of the challenge comes after the actual reactor design has been worked out.
Even if the reactor technology is well understood, there are still things like construction, supply chains, quality control, testing, licensing, and commissioning to deal with.
Which part tends to cause the biggest problems in real nuclear projects? Is it mainly the construction side, or are there usually unexpected technical issues during testing and commissioning?
r/NuclearPower • u/ilikemyprivacytbt • 8d ago
Why does a nuclear power plant need diesel generators?
Why does a nuclear POWER plant need a diesel generator to supply it with power? Can't it use it's own power generation to power itself? Can a Nuclear power plant go cold? I thought they work by having decaying atomic fuel heat water and that drives power turbines. Does nuclear fuel stop decaying?
r/NuclearPower • u/ihaveaGED • 9d ago
Newsweek: Map Shows New Nuclear Reactors Being Built Across the US
newsweek.comPretty cool map showing advanced reactor announcements in the US.