r/TTC • • 5h ago

Discussion How do you feel about branches on lines?

Post image
69 Upvotes

Because of Line 5’s future western extension. People are talking about extending it to Pearson Airport which WILL happen, but a thing I see not many people talking about (or just me) is extending the line to Square One in Mississauga, and having a branch serving Pearson Airport. I’m not sure how you guys feel about branching lines, as I see Line 5 being the most branchable line, but I’d see it as a great idea. But what do you guys feel like of branches on lines?


r/TTC • • 11h ago

PSA If you think you're doing someone a favour, you're not

124 Upvotes

Yesterday I saw an interaction with a few boomers getting on the subway as a few were leaving. The people getting on the subway didn't know how to buy a cash ticket from the machine. The boomers leaving the station, believing they were being helpful, tapped them into the subway. While I appreciate the sentiment, if the people who got on for free run into fare inspectors, they would not have proof of payment and thus be open to a decent sized fine.


r/TTC • • 6h ago

TTC quietly dropped the note that Line 5 and 6 on-time performance metrics are coming soon

30 Upvotes

Not sure if this was reported before, but I just noticed it. Guess that tripartite agreement is working out great.


r/TTC • • 6h ago

Question What's with this writing?

Post image
16 Upvotes

I noticed this writing was put above one of Pioneer Village stations names on the southbound wall. Anyone know what's up with it? It says "Pioneer V SB - Area 2 Clear".


r/TTC • • 20h ago

News Male victim dies after stabbing on TTC bus in Scarborough

Thumbnail
toronto.citynews.ca
118 Upvotes

r/TTC • • 10h ago

Question What is happening at TMU Station with the steel installations along the platform edge? An explanation from the TTC

Thumbnail ttc.ca
14 Upvotes

We've seen the pictures of the metal thingies and been confused. I hope this page - which was linked in the Access Newsletter that I receive as a Wheel-Trans customer - explains what is happening.


r/TTC • • 18h ago

Video Line 5 needs the weekend off...(sound on necessary)

24 Upvotes

r/TTC • • 1d ago

Picture 30 mins are the same for everyone.

Post image
174 Upvotes

It’s interesting how differently we experience travel time. For some, 30 minutes might be a walk around the neighbourhood. For others, it could mean taking the TTC and ending up in a completely different part of Toronto.
The idea of a 15-minute city is something we hear about quite often, but I think it’s interesting to look at what travel time actually means in everyday life.
This website got me thinking about how much of a city we might be missing simply because we don’t know what’s within a reasonable travel distance.


r/TTC • • 11h ago

Question Double tapping errors - Charged 2x?

3 Upvotes

I went out for groceries today. Tapped my Presto app - no problems, when boarding a TTC bus.

An hour later, when returning home, I jumped on the bus and tapped again with Presto app again - no problems.

As I was exiting a busy bus from the back door, I heard the beep as I walked closely to exit the doors.

Did I just get billed twice?

If I started my journey with Presto app, did it mistakenly charge my bank, credit cards, etc when I walked off?


r/TTC • • 1d ago

Picture A parking lot levy could help fund the TTC. Tell Council to approve it!

Post image
107 Upvotes

We gave Chow and council a clear mandate to improve our city’s transit.

Now it’s time for them to act on it!

This is much needed funding that will help ensure the TTC runs considering Ford rejected New Deal 2.0.

Request to speak on the official motion here, or submit comments supporting the levy.

Only takes a couple minutes!


r/TTC • • 1d ago

Discussion It's been 11 years since the TTC's largest station was built to serve the 407 Busway

101 Upvotes

and there's still no 407 Busway or any word on it


r/TTC • • 1d ago

Discussion Hot Take: We DON'T need another airport line, at least from downtown.

Thumbnail
gallery
144 Upvotes

The UP express (UPX) is currently a 2-3 car diesel airport express running every 15 munutes at its peak. However, the UPX uses a very critical heavy rail corridor that it shares with multiple GO lines.

The corridor is quad tracked. The current vision is to have the UPX running every 7.5 minutes with the parallel GO service running every 15 minutes. That's a combined headway of 5 minutes per direction all day. Given the UPX has a capacity of ~500 people / train and the GO trains have a capacity of over 4000 people / train, that's over 20,000 pphpd, which is 2/3 the maximum capacity of the OL. (credits to u/Blue_Vision)

Above, I made a map showing what the UPX corridor currently looks like, and what it could look like if we are smart enough to fully utilize it by adding infill stops, like Parkdale Terminal, and Fort York in the Downtown core, as well as currently under construction stations like Woodbine GO and Stockyards GO.

This is where previous member proposals come in. For example, for the price it would take to extend the OL along the corridor, you could instead build the infrastructure to either expand UPX capacity or increase the frequency of both the UPX and GO.

Now I could get behind mega Line 4... connecting Scarborough, North York, North Etobicoke, and Pearson.... but let's start with closing the gap first, and building option 2B.


r/TTC • • 1d ago

Discussion What if the Queen Street Streetcar Subway had been built.

Thumbnail
gallery
66 Upvotes

I made these maps a couple of months ago showing what the Streetcar network could have looked like if the Queen Street Streetcar Subway had been built. The idea dates back to 1912 when the city was looking at constructing Streetcar subways under Yonge and Queen (like what exists in Boston, Philly and San Francisco). As we all know the line under Yonge eventually became a subway but the line under Queen remained on the books as a streetcar subway until at least the late 60's, early 70's when it to was upgraded to a subway line (that is only now under construction). The TTC was serious enough about the proposal that a streetcar station was roughed in under Queen and I have heard that utility relocation was done under Osgoode to allow a station be built although i don't know if that is true or not. We came close to building the line in the 50's but a dispute between the Province and Feds over a post-war employment program saw the line differed and only the Yonge Subway built. The push for this line really died in 1967 when the "Lake shore Municipalities" (Mimico, New Toronto, and Long Branch) were amalgamated into Etobicoke. They were big supporters of the plan as they were dependent on the 507 and had been lobbying hard for a one-seat ride into Downtown. Once they were off Metro Council, the calls for a streetcar subway on Queen Street disappeared.

As for the line itself it was to start at Logan Avenue with a branch following the CN tracks to Gerrard and ramps to connect to Broadview Avenue. It was to then cross the Don River and dive into a trench before diving underground east of Sherbourne. It would then run underground to Bathurst Street and from there branch off back to the surface with connections to Dundas Street, Queen Street, and King Street. Underground turnback loops were proposed at Church and Osgoode Stations. For this map I have actually extended it to the Queensway as I think it is fair to say that had it been built then it would have eventually been extended to the Queensway to create a single line from Humber Loop to Logan Avenue. Multiple downtown routes would have been diverted onto the line and this is just my interpretation of what would have happened. The 509, 510, 511, and 512 would all be unchanged. I retained the 505 as there would still need to be an east-west route at grade to connect all the lines to Bathurst Street and thus Hillcrest. You could argue this could also be done on College with either a rivived College Streetcar or a reroute of the Harbord Streetcar. Finally I renamed the 506 to Gerrard as it would no longer run on Carlton had this been built.

The second map is just the service pattern showing how routes would operate through the line. The 503 would terminate at Osgoode while the 507 would terminate at Church. It is likely in this scenario that neither the 502 and 508 would exist.


r/TTC • • 1d ago

Discussion Line 5 Kennedy

11 Upvotes

Why do we have a total of 4 seats at the Kennedy line 5 platform?


r/TTC • • 1d ago

News TTC boss facing internal battles over attempts to push major reorganization of agency | CBC News

Thumbnail
cbc.ca
75 Upvotes

r/TTC • • 1d ago

Misc. Crackle, crackle

7 Upvotes

On the Eglinton LRT and the speaker for the automated announcements is crackling. How old are these trains?


r/TTC • • 15h ago

Misc. They cannot be serious

Post image
0 Upvotes

r/TTC • • 13h ago

Question What do you carry with you for safety while commuting?

0 Upvotes

With all the crazy behaviour on the TTC lately (given the latest Scarborough case yesterday) I'm rethinking what I should be carrying on my daily commute and walk downtown to defend myself.

Since pepper spray is illegal, what do you usually carry to be prepared for the unexpected?


r/TTC • • 2d ago

Picture New (Prototype) seated barrier spotted on Line 2.

Post image
370 Upvotes

Came across a new added feature on the Bloor-Danforth line. Spoke with a TTC member who noted they are testing it out.


r/TTC • • 2d ago

Picture A thought about an extended, large stopgap variant of Line 4, to solve the 401 problem.

Post image
80 Upvotes

Highway 401 is, notoriously known to be, crowded in both way, even till 6pm - which is when I take this photo. And, this doesn't have an alternative - unlike the similarly crowded DVP and Gardiner, where at least a future improved GO train (may be electric, may not - I talked about it in a previous post about the idea around DEMU may also reach similar performance) can be a good alternative to it in a lot of cases.

And we all know, Ford's 401 tunnel approach won't fix it, just going to make it worse.

But the blame is really on the efficiency of the car, not the tunnel. Obviously, we already have a Line 4 here that has done some work. Maybe we should just extend it?

Though there's a problem with it, if we just extend it in the normal way.

In my experience, the 401 can be red on Google Maps and still average around 30 km/h over a rush-hour trip. That’s roughly what the TTC has scheduled on Line 1 during peak periods.

If a subway along the 401 averages the same speed, the car still has a head start because it goes door to door.

So, the train needs to be fast enough to make up for the time you spend getting to the station, waiting, and transferring.

I’d aim for:

- about 2 km between stations on average, with 1.5 km as the usual minimum.

- Exceptions only made for major transfers station.

This is because every additional stop costs riders time for braking, boarding, and accelerating again, so a closely spaced station has to earn its place.

My result is:

The line would be

  • Renforth at the Mississauga Transitway station, with connections to Line 5, GO buses, and MiWay express buses. I’d also look at a very large park-and-ride for drivers coming from Mississauga. The bus connections would matter for those without car or those people commuting west in the morning who likely either don't use their car for commute or park their car in other park and ride spot along the line.
  • Woodbine at the future GO station, with Kitchener GO, UP Express, and a possible future Line 6 connection if it extends south from Humber College.
  • Rexdale–Kipling, a place where another very large park-and-ride can be easily constructed on the area under the hydro line
  • Weston–Albion/Walsh/Wilson
  • Jane–Wilson, with a potential Line 3 connection if the Ontario Line ever reaches this area.
  • Humber River Hospital
  • Keele–Downsview Park Boulevard, another alternative for Line 3
  • Downsview Park, with Line 1 and Barrie GO.
  • Sheppard West, with Line 1. I’d keep both this and Downsview Park despite the short gap because this is a major TTC bus terminal, and there's a large park and ride here with possible spance to extend it to be even bigger.
  • Bathurst–Sheppard

Then it would run through the five existing Line 4 stations, from Sheppard–Yonge to Don Mills. After it:

  • Consumers–Sheppard, for GO bus 41 and potentially rerouted Victoria Park buses. It’s close to Don Mills. I question even to myself if this is a good idea, but 41 seems to be so frequent during rush hour for me to abandon this idea. I may be persuadable.
  • Warden–Sheppard
  • Agincourt, with Stouffville GO and a potential Line 7 connection if the LRT is ever extended west from the currently planned McCowan to meet it.
  • Brimley–Progress, another stop I’d take a hard look at because the area of Scarborough Centre really has a development plan that is not comparable to other areas that deserve less stopgap. This area also has undeveloped land that can be used to create another large park-and-ride.
  • Scarborough Centre, with Line 2, GO buses, local TTC buses, and the proposed Durham–Scarborough BRT.

Two questions resulted from the design:

Would it beat 401?

My sketch comes to 37.6 km and 20 stations, or 1.98 km per gap. Assuming a 75 km/h top operating speed, I get a rough estimate of 50–53 minutes end to end, averaging 42–45 km/h. That includes about nine minutes for acceleration and braking, nine minutes for station stops, and a few extra minutes for curves and other slow sections.

Vancouver’s Expo Line is a good comparison. Waterfront to King George also has 20 stations, but it covers 28.9 km with 1.52 km between stops on average. TransLink lists 40 minutes end to end, or about 43 km/h. Expo Line has a top speed of 80 km/h, which is faster than TTC. But the target for this version of Line 4 is to use a wider stop spacing to help it get a roughly equivalent speed.

For driving, Renforth - Scarborough Centre is around 35.6 km. Averaging at around 30 km/h, one'd spend about 71 minutes on the road. That gives the subway roughly 18–21 minutes to cover station access, waiting, and transfers before the two trips tie. That’s enough to make it a real alternative for trips with good connections at both ends. It’s also why I’d judge every proposed station by how much time it saves people getting to and from the line versus how much time it adds for everyone riding through.

Would local residents go against it if the line passes through their area without a stop?

This is a really hard question, but I have a very interesting take:

If we could use TBM properly, the area without a station doesn't matter - as there's no development that's really visible around the area. Essentially, there's no need to make a consultation to residence there.

Though I am not sure how Canada/Toronto's property laws are governed with respect to the area underground of one's property.


r/TTC • • 19h ago

Video I hope turning Bloor Yonge into GTA station helps the budget shortfall

0 Upvotes

This much single party advertising is a bit much. Hopefully they paid the TTC a hefty fee


r/TTC • • 2d ago

Misc. TTC 2027 Service Plan Round 2 survey is up

Thumbnail
surveymonkey.com
23 Upvotes

More streetcar diversions💀


r/TTC • • 2d ago

Picture Mount Dennis looking fire this morning

Thumbnail
gallery
82 Upvotes

I do not usually travel this way in the morning. Couldn't resist taking a picture of the tower.


r/TTC • • 1d ago

Picture A month earlier, we were in purple paradise. A month later, a fiscal crisis and a broke TTC

Thumbnail
gallery
0 Upvotes

I know the downvotes are coming, but I just needed to put this out here.