r/talesfromtechsupport • u/Gambatte Secretly educational • Nov 27 '13
Encyclopædia Moronica: T is Tested (A Repair Is Not Completed Until It Is)
A quick one for today, TFTS; the bloodwolves are out in force today and I have a VM that keeps crashing for no apparent reason - must be those damned (checks list) transient voltages.
A few weeks after the events of M is for Musophobia, the very same pimply faced youth (PFY) as starred in that story had done very little but bombard me with how amazingly fantastic he was at everything to do with IT and technical support. Arrogant, egotistic, totally up himself - these words barely do him justice. He would constantly tell everyone around him about his monster computer, which would simultaneously run 5 WoW accounts and Glider 24/7, grinding his latest set of accounts up to level cap, which he'd then promptly sell on eBay. But he considered himself too cool to actually play WoW.
So basically, the worst kind of scum you can find in IT.
On this particular Friday morning, I was at my desk on the third floor and he was mid-spiel about he awesome he was in his previous role at the IT department when I received an email from the 2IC of the building: the 2IC had recently been upgraded to a full office, and it was time to move his PC. The 2IC was all sorts of stupid (stories for another time), but at least he knew that he didn't know about computers, so had put the request through to my team.
We did this stuff all the time, but I was down a few team members due to some recent departmental reshuffling, and everyone else was busy. I tuned back into the PFY's self-aggrandizing rant...
PFY: ...basically I was running the entire IT team, which made the actual supervisor look bad, so he got me transferred over here...
ME: PFY, the building 2IC needs his computer moved. Seeing as you're so good at IT, it shouldn't take you long to move his computer from his old desk to the new one, right?
PFY: That's easy! Half hour, tops.
ME: Well, we don't have much on this morning, and it's the 2IC, so take your time, do it right. He'll be a massive PITA if it's not done right the first time. He's getting a second screen added as well, which is already in the office.
PFY: Sure.
So about two hours pass and I come back from my morning vitamin D session to find PFY sitting in the office, checking his emails.
ME: Have you finished moving the 2ICs computer?
PFY: Yeah, it was easy, like I said.
ME: Okay, another job's come in, so...
...and I left it at that. PFY was trying to get promoted to my 2IC position, or at least a position at the same level on one of the other teams, so in the back of my head, I thought I could take him at his word that the job was done.
I should have known better. Actually, I did know better, but I disregarded my instinct (it's okay, I would pay for my hubris later).
So PFY is set to work on some other task, and we go about our day.
About 2 p.m., PFY gets a call and has to go to another department for the rest of the day. I make a note to follow up with that department so as to make sure he hasn't just taken off early for the weekend.
About half an hour to closing, and I finally get hold of someone at that department. They're basically closed, and no-one has any idea that the PFY is meant to be there. I make myself a note to reprimand the PFY first thing on Monday; it's not a good idea to be lying to take off early on a Friday when you've got your hopes up for a promotion.
Closing time finally arrives, and I start to head out of the building. My exit route just happened to take me past the building 2IC's new office, where I see him looking behind his screen with a very confused expression on his face.
ME: Hey 2IC, what's up?
2IC: Oh, my computer's not going for some reason.
ME: When did this start?
2IC: Oh, I haven't used it since it's been in this office - I've been in meetings with the boss all day. That's why it was the perfect time to get my office moved.
ME: Give me a second, I'll see what I can do.
I look behind the screen and notice that there is no power or VGA cable plugged in. Hmm, weird. Maybe they forgot to supply one with the second screen.
Check other screen: same thing.
At about this point, I let out an expletive that could be heard clearly throughout the building; as we were on the third floor, having it heard on the ground floor was quite an achievement.
I checked the back of the computer. No cords there, either. No power, no ethernet, certainly no VGA cables.
Searching through the 2IC's old desk, I found all of the cables in a tangled mess. After spending the next half hour untangling them and connecting them into the appropriate sockets, I had the 2ICs computer powered up and working on both screens. Of course, I then had to sit through the boot up and log in sequence, to make sure that everything was working correctly.
Both the building 2IC and I did not leave until an hour after closing that night.
Come Monday morning, PFY was late getting in: some excuse about a medical appointment, just like first thing every other Monday. I quickly consulted with the building 2IC who promptly approved my plan; a quick call to the front desk let the security guards in on it too.
You see, access to each floor was controlled by an RFID tag. When the PFY arrived that day, he gained access to the elevator and stairwell, but found his card would not get him through the third floor door. Eventually, he tailgated someone else through the door and made it to the office.
He dropped into his seat by the large whiteboard that we kept current out-of-office task assignments on (so as to know where a particular PFY should be, if they were not immediately on hand), and started cursing about the broken access control system and how he could build a better one himself.
I picked up the phone and made a call. Within minutes, the building 2IC arrived with his boss in tow, followed by a security guard. I met them at the office door and brought them to the PFYs desk.
PFY: What's going on?
ME: I tasked you with moving the 2IC's computer on Friday, did I not?
PFY: Yeah...
ME: And you told me you had finished it, did you not?
PFY: I did finish it!
ME: THEN WHY DID THE 2IC AND I SPEND AN HOUR ON FRIDAY NIGHT MAKING IT WORK?
PFY: It must have broken after I left!
ME: Oh, I see - so every single cable just disconnected themselves, moved back to the original office and put themselves in a drawer, did they?
PFY: Wha...
ME: Turn your head to the right, and tell me what is written across the top of the whiteboard.
PFY: Task, Location...
ME: Across the top.
PFY: A job is not...
ME: Continue...
PFY: A job is not completed until it is tested.
ME: Correct. So, given the way that the job was completed on Friday, I must conclude that you either chose to ignore this office's standard procedure for completing work, or that you are so incompetent as to not be able to determine the difference between a working computer and one with no cables connected to it AT ALL, or that you did almost nothing for over two hours, lied about completing the job and hoped you wouldn't get caught.
PFY: Bu...
ME: (interrupting him mid-word, near trembling with rage)
ME: SHUT
ME: UP
ME: None of these options are suitable for a person to continue working here, either in this office or for me.
ME: Compounding the matter is the fact that you lied about an out of office job on Friday, leaving the rest of the team to pick up the slack while you took off for an early weekend. I've been in touch with the department head to confirm, both on Friday afternoon and again this morning, and no one asked for you to go over there, nor saw you in the building.
ME: Your card access to this building has been limited to unclassified areas only, and will be revoked completely as soon as you leave the building. You are to report to the general resource pool immediately - I'll be calling your new supervisor to let them know that you're on your way.
ME: (to Security Guard) Please escort this man out of the building.
ME: (to PFY) Get the hell out of my building.
PFY was escorted away by Security, and 2IC came up to me:
2IC: You looked like you wanted to swear at him.
ME: Because I did.
2IC: I still think we should have kept him around to scrub the toilets.
ME: So he could do a terrible job of that too? Better to just be rid of him.
POSTSCRIPT: Two weeks later, HR sent me the performance review form for that particular PFY. I sent it back with a note saying that he no longer worked for my department, with a full transcript of the reasons why.
They sent it back; apparently he'd lasted longer working for me than any of his previous departments.
I filled it out - brutally honestly. My final line: "While PFY does show some technical aptitude, his unwarranted arrogance leads him to have a lackadaisical and borderline insubordinate attitude, which prevents him from gaining any significant experience in this role."
My counterpart at the general resource pool (where people who are still under contract but unable to perform their duties end up) later told me that he had put him in a team that was clearing bushes from outside a company building. The following day, he had to move him to a team that was painting a wall, as he was unable to follow the safety instructions for using the chainsaw.
Last I heard, the PFY had moved on to a sales role with another company.
Browse other volumes of the Encyclopædia: ABCDEFGHIJKLMNOPQRSTUVWXYZ
65
u/Meltingteeth You're on my shit-list now. Nov 27 '13
Rage inducing shit right there. A simple computer move is nothing so long as the new location has activated ports (or a good signal). How The most annoying part of hooking up the computer itself is cable management and screwing in the video cable. Ridiculous.
Having said that, I make a habit of grinding fundamentals like that into starting employees. A little while ago we were doing a massive system move from one computer lab to another within the building. We started timing each other on how long it took to completely set up a system, including mounting the tower and connecting every cable. My record is 2:48. Wound up being pretty fun.
21
u/Antarioo In the land of the blind, one eye is king Nov 27 '13
those are some pretty solid contracts and lenient HR, even with my socialist european standards he'd have gotten enough official warnings to fire him.
12
u/Koras Quis administrat ipsos administratores? Nov 27 '13
You're a stronger person than I am, I would've taken the cables he didn't plug in and beat him to death with them.
Why was he kept on and assigned elsewhere rather than just plain fired out of interest? I'm not sure how things work in companies like that
12
u/story--teller Nov 27 '13
Ahh that special kind of rage when you have to use two breaths of air to yell "SHUT! UP!"
Talking about ineptitude I once worked together with an individual in a food stand where we made pizza conveyor belt style. Who the fuck can't put pepperoni topping on a pizza after being shown how it is done more than a dozen times? Was you PFY by any chance named Theis? and somehow in Denmark during summer at some point?
7
u/Themantogoto Underpaid minion Nov 27 '13
I would love to be payed for two hours to untangle cables, easy compared to the typical. Heck I would have zip tied everything together so it wouldn't happen again! How could someone expect to get away with that in a company with a ticketing system much less a 2ic. I hate arrogance, one of the worst character flaws there is IMO.
6
u/cyberjacob User.exe has stopped responding. Terminate Program? Nov 27 '13
"it was time move his PC", typo?
11
u/[deleted] Nov 28 '13
Good call. Would have made the fatal mistake of agreeing with your 2IC
12
u/tardis42 Nov 27 '13
They should have left him on the chainsaw crew and had him work alone /s /orisit
8
u/[deleted] Nov 27 '13
Sounds like he found the right job for a man of his demeanor.
7
u/mismanaged Pretend support for pretend compensation. Nov 27 '13
wow... just... wow.
What kind of person doesn't take the hint after screwing up so badly?
7
u/webkac May 16 '14
Recently demoted and no doubt disgruntled employee given access to company campus and a chainsaw.
Who says HR has no sense of humor?
9
u/vincentkant "I have a ball peen hammer" - lawtechie Nov 27 '13
I as a programmer use the rule to test any program in all the posible ways. I tryed always to follow that rule, and every project under my wing have been sucesfull in my tests. Somethimes, when test dependen of other users and they never tested, I was able to shake of the problems telling them that they should tested it.
I have a history of the tame I was not allowed to perform my full test procedures on a system, and all the problems that my boss made appear after not letting me follow this rule.
4
u/Banane9 Nov 28 '13
You should totally make a print version of this :D
4
u/[deleted] Dec 14 '13
was this the list
3
u/EquipLordBritish Feb 14 '14
Encyclopædia Moronica: U is for Uptime
2
u/ARasool May 16 '14
Jesus... Just reading this made my blood boil a bit.
Can...can I come work for you in the future? hahah
0
u/[deleted] Nov 27 '13
[deleted] — view deleted comment