r/AskEngineers • • 6h ago

Discussion Buyers or supply chain engineers at manufacturing companies for a thesis interview? (30-45 min, online)

3 Upvotes

I'll just say it: I'm stuck. I'm in the last weeks of my MSc in Supply Chain Management at Tilburg University and still need 6 interviews before mid-December to finish my thesis. I've been chasing companies for weeks and the response has been thin.

My thesis is about export restrictions on raw materials, like China's licences on rare earths and magnets: how manufacturing firms notice them, what they do to the business, and how firms respond.

Who I'm looking for: someone in purchasing or supply chain at a manufacturing or assembly companies. Online, Dutch or English, fully anonymised. If the restrictions barely touched your company, that's just as useful.

A referral helps just as much. Reply here or send me a DM. You would be saving my thesis.


r/AskEngineers • • 2h ago

Mechanical Is my mailbox failure point weak enough?

2 Upvotes

I’ve built my own mailbox and post out of w8x15 and 8x8x5/16 HSS. I would like to ensure the four 1/4” 304 stainless bolts would shear if it were struck by a vehicle.

The spacing of the four 5/16” holes is 6” center to center by 2 3/4” center to center. The base will be mounted flush to the ground which is about 7” below road height. The bolts will be snug.


r/AskEngineers • • 8h ago

Mechanical Can Nusselt number be less than 1?

Thumbnail reddit.com
2 Upvotes