r/AxleEnergy • • 21h ago

Discussion Just had something weird happen?

1 Upvotes

Well I thought it was weird.

Just had an axle event. During this I was exporting around 9.0kWh for the hour. At the same time there I was aware of a power down event from octopus since I saw the email.

I had my car plugged in from this morning and the schedule is on the octopus app to charge it tonight during the cheap window, so no mid day charging.

However when axle was exporting it was also charging the car at 7kW? This immediately stopped when axle stopped exporting at 16:00.

This is the first time I've seen this behaviour, and to me at least makes no sense since clearly there's a need for power why would the car charge from this happening during the time? I kept checking octopus to see if times updated but nothing.

Also appreciate this is covered by more than just axle, but since it stopped when axle stopped I thought here would be best first. I also know axle doesn't think there's an issues with combining them with octopus (unlike octopus) so figured I'd get more helpful answers here.


r/AxleEnergy • • 19h ago

Support Question Myenergi Eddi with sigenergy

2 Upvotes

Eddi is is a water heater which waits till my sigenergy battery is full from solar and then heats the water to a given maximum before the system starts exporting to grid (in winter it gets a boost overnight at cheap rate). Works flawlessly except that it treats an Axle event as a signal to start heating from the battery so Axle asks for say 4.5kW but Eddi starts drawing 4 so Axle gets 0.5. I can turn Eddi off manually for the Axle session which works but is a pain. Anyone else?


r/AxleEnergy • • 23h ago

News Short notice event today 3-4pm

Post image
11 Upvotes

Today's 3:00 PM Axle event is driven by severe transmission grid constraints combined with a cold snap, rather than the usual lack of wind generation.

National Grid Tightness (NESO Margin Notices):The National Energy System Operator (NESO) issued two Electricity Margin Notices for today, including a projected 2,400 MW supply margin shortfall between 2:00 PM and 8:00 PM.

Transmission Bottlenecks (The Primary Culprit):Around 6,000 MW of generation capacity is currently trapped or excluded from the grid's spare buffer due to planned maintenance and engineering work on high voltage transmission lines. Even when wind farms are generating, the grid cannot move that power efficiently from where it is produced to high demand areas.