r/DIYUK • u/TheFellRunner • 10h ago
Tiling First ever tiling job - most stressful day ever!
Definitely the most stressful day of this bathroom renovation, and a new found respect for tilers.
Not helped by the fact that these tiles are 4-in-1, with 2mm lines across the middles, but I found out when trying to use the levelling system that they had tapered edges (see last pic). So a 2mm spacer grabbed the bottom of the tile leaving more like a 3mm gap at the top where you’d actually see it. Not a problem for normal tiles, but because these ones already had built-in joints, I couldn’t use the levelling system. I couldn’t even use spacers properly, but had to just stick the tip of them in the top part of the joint.
Wisdom seemed to be to start in the back corner, but I wanted a perfect tile lay at the door so I started there and worked backwards, leaving myself with an escape route down the left hand side. Worked out ok but space got super tight halfway through.
Of all the trades this has to be one of the most high pressure. You have one shot (especially here with an underfloor heating wire) and it has to be level and aligned with the neighbouring tiles both horizontally and vertically, and any little error is going to be visible for ever.
Super happy though, even if it’s not an experience I’d rush to repeat!