r/ECE • • 16h ago

CAREER A Great Analog IC Design Interview resource I found

15 Upvotes

For some context, I'm at one of the top ECE programs and even then it's been extremely difficult for me to find internships/full-time IC design roles right now. I've been prepping for interviews basically nonstop and the amount of resources for analog IC design interviews is pretty small. Most of the interview prep material I've tried just throw problems at me with answers that skip the intuition or even detailed explanations which often leaves me more confused than when I started.

Recently came across "Preparing for IC Design Technical Interviews" published by IEEE and Wiley and figured I'd share since I haven't seen it mentioned here. To cut the crap, it's probably one of best, if not the best, IC design interview prep book/material I've read. The book focuses on analog and mixed-signal IC design and has 50 questions, all the kind where someone draws a circuit and challenges you on things (like how it behaves, why so and what happens if you change something). The solutions explain the intuition behind everything instead of skipping steps and only doing math. I've been doing them and then checking the answer and it has helped a lot with thinking on the spot. You still need Razavi/Baker for the fundamentals but this fills the gap between knowing the material and being able to apply that during interviews.

Just wanted to share this in case anyone was in the same position!

The link if anyone wanted to check it out:
https://www.amazon.com/dp/1394431074


r/ECE • • 5h ago

PROJECT Cyclone 10 LP: Can Tapped Delay Lines Run from LLCOMB_256 to LLCOMB_0?

Post image
6 Upvotes

I have synthesized a 4 tapped delay lines, and due to limitations in only being able to use a the 2x20 i/o header on the EK10CLU256 evaluation board, I am limited to certain row i/o's and column i/o's, both of which are on the the bottom half of the fpga. 

Currently, the input signal has to traverse from row 0 to row 17, and then pass through the delay line starting from LLCOMB_0(in row17) through to LLCOMB_256(in row1). To keep the delay lines symmetric(consistent delay for the four tapped delay lines) and to decrease the input signals length of travel, I was wondering if it is possible to synthesize the delay line such that the signal enters the delay line from LLCOMB_256(row1) and traverse to LLCOMB_0(row17) instead. This would allow the signal to immediately enter the tapped delay line instead of having to go traverse to row 17.

I do not think this is possible as the carry out and carryin of the LLCOMB primitive are connected in a specific manner (top to bottom).
Thank you


r/ECE • • 13h ago

Looking for real-world problem statements for our college field project (IoT / Embedded Systems)

1 Upvotes

Hey everyone!

We're a group of second-year Electronics and Computer Science students from Mumbai, India, working on a college field project.

As part of the project, we're expected to identify a real-world problem, understand it through field visits or interactions with people, and develop a practical solution using IoT, embedded systems or related technologies.

We're currently in the problem-discovery stage and would love to hear from people working in industries such as manufacturing, automation, electronics, EVs, healthcare, etc.

What are some problems or challenges you regularly come across in your work?

Are there processes that are still unnecessarily manual? Are there issues where existing solutions are too expensive, impractical or simply don't work very well?

We're not looking for someone to hand us a project idea. We genuinely want to understand problems people face in their day-to-day work and explore whether we can build something useful around them.

Any insights, suggestions or even an opportunity to have a short conversation or visit a workplace would be really helpful!

Thanks!


r/ECE • • 17h ago

Offer decision Kodiak AI field integration mvs Tesla : Manufacturing test engineer

0 Upvotes

I interviewed with both Tesla and Kodiak some time back and I accepted an offer from Kodiak and now Tesla finally reached with an offer, I am not looking at money tbh , Kodiak my boss is a cool guy and the job has a better work life balance so but I know what Tesla would do for my resume . What are your thoughts, how’s the wlb in Tesla and also I’m kinda of a slow learner


r/ECE • • 22h ago

PROJECT Help Please!! Using Ansys HFSS for RFID Bandage antenna design.

Post image
0 Upvotes

So our minor project submission is in 2 days, please don't judge me, because I am more of a SDR guy than in antenna design anand I am hurrying a lot because my group mates are no good at all. So all the work is upon me. So we had to design a meander dipole antenna and it needed to be operated in -10dB between 855-867 MHz for the S11 vs freq plot. But it's coming around 0.42 db at 867 MHz. So basically the whole power is getting reflected I guess? So it had to have three cases, a moist, wet and dry case. So I have been referring to some papers and all, now the excitation , the impedance default is 50 ohm , but the rfid bandage is meant to operate at 10-j191 ohm(that's what my mentor told me so). So the plot is coming something like this after implementation, I mean it's the first validation analysis after designing the antenna if its working or not. But there must be some hill-like structure isn't it? Please help me. I am in big trouble and my group mates aren't serious at all. All advice and help are welcome.