r/FreeCAD • u/Wise-Editor-6161 • 7h ago
Why does adding construction lines cause constraint redundancy and cause shifting lines?


I've been doing this to create sections in my sketch, a 100x2.5mm rectangle, then a construction line of 100x10mm and so on, its fine until I get down to about the 6th row, then as soon as I press enter on the first image, I suddenly get a shifted line on the 2nd image and I have no idea why.... It doesn't make any sense to me.
2
Upvotes
3
u/R2W1E9 5h ago
Redundancy likely happened long before the construction line. Can't imagine that none of those 100mm dimensions are redundant.
You should simplify the sketch using equal constraints, arrays, mirrors stc.
Post the file here File.io so we can take a look at it.
2
u/Powerful_Debt_5869 4h ago edited 4h ago
There is ONLY one 100mm constraint needed at all. Please start all over with proper Videos to teach you basics.
This solves that Problem, but the sketch will be invalid due to open wires resulting.. but i do not know what yxou wanted to achieve
First touch with freecad:
https://youtu.be/lTLDhFp5plA
0
u/Sufficient-Sun-6683 6h ago
I've been having issues with construction lines and constraints also. I'll use a construction line to create a constraint location. Then when I connect to it to draw like an arc. It will say the arc is unconstrained. Even though I'm connecting to constrained points.