Trying to keep this short, we hired and signed a contract with a GC for our master bathroom remodel. He got into a fight with the plumber, who drilled too many holes in our ceiling joist and structurally compromised our house. He retroactively got a permit from the village, who came in and failed the rough in inspection. He had a third party come in and assess the damage, then he reinforced our ceiling joists and continued the project.
Now he is 95% done, with one tiny section of tile to complete, and the plumber came in and installed the finishings. The GC fought again with the plumber, because the floor mounted faucet was wobbly and the caulk job on the tub was clearly hiding that the tubs feet were not properly adjusted, and he cut the caulk and it wobbled.
Another few weeks of his lawyer and the plumbers lawyer going back and forth, the plumber asked to be removed from the project, now the GC says he will hire a different plumber to fix the mess ups. This project started in April, now itās the end of November. The legal dispute has caused the project to be paused for half the year, and Iām beyond frustrated.
The GC is telling us that when this is all done, he will need to send us a larger bill that we will need to dispute so he can sue the plumber for damages. This is making me nervous, like it will get us in legal problems, or stuck with the bill. The plumber caused maybe $10k in damages, but the GC is saying heās suing him for like $90k. I donāt think heās going to win this lawsuit for that amount.
We will be talking to a lawyer, but I wanted any input or comments as to whether this is normal or weird.
To add to this, the GC has been painstakingly slow with drywalling and tiling. Like, putting up one piece of drywall a day. Now that he has like 10 small tiles left to place, he will not do it until the lawyers have figured out which plumber warranties what parts of the plumbing. The tiles he needs to finish do not touch any plumbing fixtures. He is coming to pack all his tools and leave āin case this dispute takes longerā and I believe he is doing this because he doesnāt want to work the month of December. Is there a legal strategy to this? We are left with a bathroom that we cannot use.
Thank you for any input.