r/ITProfessionals • u/Dangerous-Mix-667 • 2h ago
Have you ever moved a batch job to a lower-carbon hour? What made it possible?
I’m Gary, founder of Tao Climate. I’m trying to understand how much flexibility people actually have when scheduling compute.
Say a two-hour batch job normally starts at 17:00. The grid has a lower carbon intensity at 13:00, there’s enough power headroom, and either slot meets the deadline. At your site, who could actually make that call? Or is 13:00 already off the table because the input data hasn’t landed or another team has the GPUs booked?
I’d love to hear about a real job you moved, or one that looked movable on paper and had to stay put. What decided it?