r/MARTA • u/XgGamergX • 12h ago
MARTA Rapid’s Future
So as we know, MARTA has several more Rapid routes planned in their phase 2 project list, one being North Avenue and the other being Northside Drive. The A Line is open and Campbellton (C) is still being designed.
Something I’ve been thinking about is that alot of these routes could be extended or modified down the line to create more interconnectivity.
- Rapid Campbellton for example could easily be extended to West End Station and connect to the Beltline and several other bus routes at that station.
- Rapid Northside could have its alignment modified to make a stop at West End as well. While that would increase travel times a little, it would provide better connectivity.
- The Rapid A Line could at minimum be extended westward and interline north along Northside Drive once Rapid Northside is completed. To go even further, it could maybe even be extended along 17th Street to Arts Center.
What do you all think?
