r/Machinists • u/Creative-Bison-1216 • 14h ago
Issues with 1st shift, need advice
So my 1st shift operator is terrible. They never do 5S, dont measure parts, cherry pick jobs, and produce 64% less parts than I have since start of the year. I came in to 80 of 100 parts (its a shaft) that 1st had run and the moment I looked at them I noticed the holes weren't centerline. Came out to be .016 off center and then another -.018 off on X (Tolerance +/- .004) I changed offsets and ran the last 20 parts within tolerance and informed my supervision. My lead and supervisor set the parts in the office and "sent an email".... at some point the parts ended up being sent out to get plated. The response from higher ups was that if the parts were off thats a machine issue because if we set everything up correctly (fixtures are keyed to table, so its literally placing the fixture, calling up the program and making sure you have the right tools in the magazine) the machine should make the parts right and its not the operators fault. But we are required to verify our parts 1st, middle, and last. So even if they dont want to blame this guy for the problem...how can it be okay that he runs 80 and the next shift (Ive been doing this 6 months and he has been there 4 years) catches the issue! And it happens often... 1 time it was holes that weren't tapped all the way through (300 parts). Another was a ball tipped endmill had broken at the tip and the parts he was placing in the "good" bin were all chewed up. Another was crashing an endmill into a steel part into a vise which shattered it and bent the 3/4in steel angle significantly which knocked the vise .063 off and then continued running parts in it before I came in for my shift and noticed all the holes were drifting on the Y axis. Scrapped 18 parts he ran. He never reported the crash.
Basically Im thinking I should just let his parts go on and get plated or bent or sent wherever and then once the company wastes the money to do those processes and the parts come back and cant be used, maybe they'll care. The 80 shafts he ruined are part of a 100 part job that take our Lathe 16 hours to produce. Then its about 10 hours to mill. Then they send them out to be plated. So they have money into these parts.
Let me know what youd do. Thanks in advance