r/MicrosoftFabric • • 4d ago

Announcement Share Your Fabric Idea Links | November 24, 2026 Edition

3 Upvotes

This post is a space to highlight a Fabric Idea that you believe deserves more visibility and votes. If there’s an improvement you’re particularly interested in, feel free to share:

  • [Required] A link to the Idea
  • [Optional] A brief explanation of why it would be valuable
  • [Optional] Any context about the scenario or need it supports

If you come across an idea that you agree with, give it a vote on the Fabric Ideas site.


r/MicrosoftFabric • • 26d ago

Discussion November 2026 | "What are you working on?"

12 Upvotes

Welcome to the open thread for r/MicrosoftFabric members!

This is your space to share what you’re working on, compare notes, offer feedback, or simply lurk and soak it all in - whether it’s a new project, a feature you’re exploring, or something you just launched and are proud of (yes, humble brags are encouraged!).

It doesn’t have to be polished or perfect. This thread is for the in-progress, the “I can’t believe I got it to work,” and the “I’m still figuring it out.”

So, what are you working on this month?

---

Want to help shape the future of Microsoft Fabric? Join the Fabric User Panel and share your feedback directly with the team!


r/MicrosoftFabric • • 17h ago

Community Share Impact IQ gets a glow-up....and now works with Fabric Apps!

Post image
15 Upvotes

For those who haven't followed my updates over the years....Impact IQ is a free, open-source tool that identifies exactly where your semantic model tables, columns, and measures are used across Power BI Reports, across all workspaces, down to the visual.

The project just hit 200 stars....and it's time to finally make a post about two new things:

  • It has a fancy new glow-up. It looks more like an actual tool now vs only a PowerShell-style script.
  • It now pulls the Model metadata from Fabric Apps!

    • This will parse the custom queries in a Fabric App (even if your Fabric App uses several models) and show the exact fields and measures used from the models.

      • With Fabric Apps being primarily prompt/AI-based, this info will become far more important to know before making model changes.

It also adds a few more run modes outside of the standard Workspace mode - (Report, Model, Fabric App, Data Agent).....choose the items and it will pull all the related items that use it.

All to say, I hope the tool continues to help every developer know exactly which visuals, reports, and apps will break before any model change!

https://github.com/BeSmarterWithData/ImpactIQ

I started at Microsoft this year in March....so I should probably make it clear: this is a personal project and not related, endorsed, or sponsored by Microsoft. This project dates back to early 2023.


r/MicrosoftFabric • • 1d ago

Data Factory Follow-up: what copy activities actually cost on Fabric vs ADF (using Microsoft's own test runs)

8 Upvotes

Disclosure: I work on ETLMaestro, which orchestrates ADF and Fabric pipelines, so weigh that. Nothing below is about our product.

A few weeks ago I posted an orchestration cost breakdown for ADF vs Fabric, and someone fairly pointed out it's meaningless without copy, because that's where the money goes. So here's copy. I'm on the business side, not a data engineer, so I pieced this together from Microsoft's own docs and test results. If there's interest, I'll try running the same copy on both myself. Just let me know!

TL;DR: per unit of copy throughput, Fabric is about 8% more than ADF at list price. The settings on the copy itself can swing the cost 6x, which matters a lot more than which platform you're on.

The rates first. ADF bills copy as DIUs used × duration, $0.25 per DIU-hour on the Azure IR, rounded up to the minute. Fabric bills 1.5 CU-hours per throughput unit per hour, which is $0.27 at $0.18 per CU-hour pay-as-you-go. Fabric's throughput setting (ITO) is basically its version of DIUs. It's even saved as dataIntegrationUnits in the pipeline JSON. Same units for the same time, Fabric costs about 8% more.

So where does "hella expensive" come from? Microsoft published a test that copies 1.5 billion rows from Azure SQL into a Fabric Lakehouse and lists the CU-seconds for every run. I converted them at $0.18:

Copy settingsTimeCost
Defaults, no partitioning2h 11m$2.38
Dynamic range on a heap, parallelism on Auto (it used 251 copies)36m$14.00
Same, parallelism capped at 5012m$5.06
Dynamic range on a clustered index, capped at 506.5m$2.74
Physical partitions (85)12m$13.79

Same data, same platform, $2.38 to $14. The $14 run also pinned the source database at 100% CPU. For comparison, if ADF ran the default copy with the same 4 DIUs for the same time, it'd be about $2.18.

They also tested the throughput setting directly. On Auto it picked 100. Capping it at 50 made the copy 34% slower and used 45% fewer CUs, about $4.46 down to $2.43.

If you're on a capacity you already pay for, the hit shows up as throttling instead of a bill. An F2 has 172,800 CU-seconds in a day, so that one $14 copy is about 1.6 days of an F2. I suspect that's where a lot of the bad experiences come from.

What Microsoft's guidance suggests checking:

  • usedDataIntegrationUnits in the copy output shows what Auto actually picked
  • cap the throughput setting on loads that don't need to be fast
  • on heap tables, set parallelism instead of leaving it on Auto
  • if you use a Copy job with incremental copy, that meter is 3 CU-hours per unit-hour, double the normal rate

Caveats: Microsoft says these aren't formal benchmarks. It was an F64 trial copying across regions (East US 2 to West US 2), and your source will matter more than anything here.

Two corrections to my last post, since people were nice enough to engage with it:

ADF's $0.80 charge for a pipeline with no trigger and no runs only starts after a full month of zero runs.

Pausing a Fabric capacity between runs doesn't avoid paying for what the runs used. Fabric bills the smoothed usage when you pause.

Has anyone measured the same load on both? I'd love to see real side-by-side numbers.

Sources: Microsoft's copy performance tests, Fabric pipeline pricing, ADF DIU billing, ADF per-minute rounding, Copy job pricing example, ADF pipeline pricing


r/MicrosoftFabric • • 1d ago

Community Share first look at apacheossie

Post image
21 Upvotes

r/MicrosoftFabric • • 1d ago

Fabric IQ Fabric Plans / Fabric Apps vs Jedox

5 Upvotes

Hey guys, I'm responsible for building a data platform for our manufacturing holding. We see a huge potential in the Fabric platform itself, but I'm still torn on our planning and forecasting needs.

Our controlling pushes hard for Jedox solution. The platform seems very mature, but our needs are rather basic. Take cost and revenue lines, add manual input and comments, do some forecast with writeback for the audit trail.

I heard a lot of promises over Fabric Plans but also a lot of "don't even try it, its a trap".

I'm unsure whether to accept the implementation of mature and very expensive overkill tool (from my POV) or try to push for a Fabric Planning.

Could you please share your experiences and advice? Would really help me a lot.

Thank you!


r/MicrosoftFabric • • 1d ago

Administration & Governance Fabrics capacity issues - Need help

5 Upvotes

Hi all,

we have F4 fabric capacity in our organisation, that Is connected via VNet connection to SQL instance.
We have around 60 Power BI pro users and around 50 reports published on power bi service (all import model except one that is direct query).
The biggest problem that we are facing is that the Vnet gateway consumes 80% of the F4 capacity, leaving 20% for refreshes and interactive utilisation.
I dont know why 80% is being consumed and what can I do to make our lives easier. It is like walking on eggshells - we test something and capacity exceeds more than 100% and we have to increase to F8 for a day so that other reports work for the report users.
Please if someone can advice and provide practical solution, I would really be grateful.


r/MicrosoftFabric • • 1d ago

Data Factory Run dimension in pipeline run conditions

5 Upvotes

https://learn.microsoft.com/en-us/fabric/data-factory/pipeline-run-conditions#run-dimensions

Is it possible to retrieve the upstream pipeline's run dimension value using a pipeline expression?


r/MicrosoftFabric • • 1d ago

Certification Passed DP-600 (Fabric Analytics Engineer) with 838 score! Here's what worked for me

10 Upvotes

Just cleared DP-600 today and wanted to share what helped in case it's useful for anyone
What I used:

  • Microsoft Learn docs (the source of truth)
  • [Practice tests: please go through the practice assessments as well
  • Working through every wrong answer until I understood why it was wrong, instead of memorizing the right one

Topics that showed up a lot in my prep:

  • Lakehouse vs. Warehouse: know which one fits which requirement (T-SQL/Python, unstructured data, RLS)
  • Direct Lake: fallback behavior and how to read Performance Analyzer
  • Storage modes: DirectQuery fact + Dual dimensions
  • XMLA endpoint: tenant vs. capacity settings, license mode, service principals
  • Deployment pipelines vs. Git integration: they're separate things
  • DAX: CALCULATE + USERELATIONSHIP for role-playing dimensions, calculation groups
  • Query folding in Dataflow Gen2: once a step breaks the fold, later steps don't fold either
  • KQL basics: summarize ... by and bin()
  • Security layers: workspace roles, item sharing, object-level, RLS, column-level and masking

Tips:

  1. Read each question for keywords like "least privilege," "minimize effort," and "first," because they decide the answer.
  2. For case studies, read the requirements before the questions, and match names to what each object really is (workspace, lakehouse, shortcut).
  3. Don't just memorize answers. The same concept comes back reworded.
  4. Drag-and-drop items sometimes list the answer key differently from what the docs say, so reason it through.

Happy to answer questions. Good luck to everyone preparing! 🙌


r/MicrosoftFabric • • 1d ago

Data Warehouse Stop current session

5 Upvotes

When I close a T-SQL notebook I get the question if I want to stop the current session. What type of session is there with T-SQL? What happens if I click No?


r/MicrosoftFabric • • 2d ago

Community Share Fabric app about Fabric Apps video

7 Upvotes

Since so many of you enjoyed my post that introduced a Fabric App about Fabric Apps and made it my most popular post of all time I thought I would make this video as a thank you.

By the way, Happy Thanksgiving to all who celebrate it.


r/MicrosoftFabric • • 2d ago

App Development Does anyone know when the Eventhouse connector to Fabric Apps will be available?

7 Upvotes

For that sweet KQL Real Time Fabric Apps :) It looks like it's currently disabled - I'm using a custom KQL API with a UDF secret but Client wants to do a multi-ws deployment so I'm trying to figure out a clean way to do it 🫠


r/MicrosoftFabric • • 2d ago

Data Engineering Business Central 29.1 Fabric Mirroring (Preview) – Always Snapshot, never Incremental?

5 Upvotes

I've been testing the new native Business Central 29.1 Mirroring to Microsoft Fabric.

The initial setup works, and data is successfully replicated to Fabric. However, every subsequent export continues to run as Snapshot, even after running automatically overnight.

  • Export Type is always Snapshot
  • Start Watermark and End Watermark always remain 0
  • All exports complete successfully
  • The same tables are fully exported every time
  • Automatic scheduled exports behave the same way

I expected the initial export to be a snapshot, followed by incremental exports.

Has anyone managed to get incremental exports working with the new BC 29.1 Mirroring integration?

Is this a known preview limitation/bug, or am I missing something in the configuration?


r/MicrosoftFabric • • 3d ago

Discussion Just a reminder that 3 days ago AI solved the Riemann Hypothesis, arguably the hardest math problem of all time, meanwhile we still have this

Post image
81 Upvotes

r/MicrosoftFabric • • 2d ago

Data Engineering Claude with VS Code Fabric Data Engineering extension is broken?

2 Upvotes

Hi guys,

A few months ago I read a post by u/QixiaoW that the Fabric Data Engineering VS Code ext was getting Claude Code support.

Just in time for when my org started handing out CC subscriptions. I switched to the pre-release version of the extension, and it loaded a bunch of tools including some mcp servers.

The problem is that I can't get it to work, fully. The fabric-notebook-content mcp is throwing some errors so it can't identify indexes that are needed to edit code.

Is this working for anyone else?

I asked CC to make a summary:

Title: Fabric Data Engineering MCP server: fabric_notebook_content / fabric_notebook_edit publish an empty input schema, so numeric index arguments are rejected

Problem

  • tools/list returns {"type":"object","properties":{}} for fabric_notebook_content and fabric_notebook_edit. The server still validates calls against a typed schema.
  • With no type information, the client sends index: 1 as the string "1". The call then fails with: MCP error -32602 … path ["index"]: Expected number, received string.
  • So get_cell can't be used, and list_cells only returns a truncated preview. Index-based edits (update, insert, delete) are probably affected the same way.

Steps to reproduce: call fabric_notebook_content with action: "get_cell", a valid notebookUri and index: 1

Expected: a full input schema in tools/list, and get_cell returns the cell's full source.

Likely cause and fix: fabric_list_items and fabric_create_notebook on the same server publish full schemas. The two broken tools probably use a schema that doesn't convert to JSON Schema, such as a discriminated union or a .superRefine. Fix: publish the real schema. As a stopgap, accept numeric strings for index, startCell and endCell (e.g. z.coerce.number()).

Environment

  • Windows 11, VS Code 1.147.0 (x64)
  • Synapse VS Code extension (synapsevscode.synapse) 1.28.1, which provides the MCP server
  • Claude Code extension (anthropic.claude-code) 2.1.331

r/MicrosoftFabric • • 3d ago

Data Engineering Im tired boss

76 Upvotes

SQL Endpoint refreshes are taking longer and longer. Everything prepared in Spark takes another + 10 min as I pray the SQL Endpoint will finally see fresh data.

At what point do I just simply switch over to Databricks, including 50+ customers? And dont suggest pure Spark, we need the Warehouse and the Warehouse doesnt know what OneLake is.

P.s. Yeah I am just sick of the dumbshit that still isnt fixed and gets progressively worse the bigger your environment gets.


r/MicrosoftFabric • • 3d ago

Certification Passed the DP-700! Thanks to this sub + a tip for non-native English speakers

23 Upvotes

Hey guys!

Just passed the DP-700 and wanted to thank everyone here. I spent a lot of time reading posts, looking for study materials and learning from other people's experiences. It helped me a lot!

I also wanted to share a quick tip that might help other non-native English speakers.

I'm Brazilian and took the exam in Portuguese because it's easier for me to read and understand longer questions that way. The problem is that we use pretty much every technical term in English when working with data, and some of the Portuguese translations can be quite confusing.

This actually happened to me during the exam. I knew what the question was asking but couldn't recognize the technical term in the Portuguese answers.

Luckily, OnVUE let me switch to English. I immediately recognized the term, switched back to Portuguese and selected my answer.

So, if you're unsure which language to choose, consider which one you're more comfortable reading in. It's not really about how good your English is, it's more about exam strategy.

Feel free to DM me if you have any questions about my preparation.

Also, for those who have already passed, what's something you wish you'd known before taking the exam?

I shared this tip with my colleagues on LinkedIn. The post is in Portuguese, but I really wanted to thank everyone in this sub for helping me get here.

My LinkedIn post (in Portuguese):

https://pt.linkedin.com/posts/lucasftleonardo_dp700-microsoftfabric-engenhariadedados-activity-7531130600125239296-g77K

If you guys could drop a like, I'd appreciate it. Trying to get a little extra visibility at work too, haha :)

My Microsoft certification:

https://learn.microsoft.com/api/credentials/share/pt-br/LucasTinoco-6668/C43C1384DD4BEB6B?sharingId=4058BB75293EAA89

Thanks again, guys, and good luck to everyone studying for the exam!


r/MicrosoftFabric • • 2d ago

Discussion Hi Im not able to use fabric free trail. Can anyone share fabric free trial. Or share entra ID so i can learn ms fabric. Or is there any other way to create free trail. Or dropping email to Microsoft will help

0 Upvotes

Hi Im not able to use fabric free trail. Can anyone share fabric free trial. Or share entra ID so i can learn ms fabric. Or is there any other way to create free trai


r/MicrosoftFabric • • 3d ago

App Development Query Rewrites - Fabric App Performance Optimization Part 2

10 Upvotes

Part 2 of my Fabric App Performance Optimization series is about query rewrites.

In Part 1, I looked at how you can run fewer queries without changing the design. This time I wanted to see how much you could gain by rewriting a single query. Same semantic model, same measures, same results for the chart. The only thing I changed was how the DAX built the result table.

I expected the difference to be barely measurable. Instead compared with the original query, the final rewrite took ~50% less time and used 56% less CPU, based on median cold-run measurements.

The post has the DAX side by side, the storage-engine timings, and the prompts I used to get Copilot to try the rewrites. Check it out:

https://savoy9.github.io/rayfin-performance-query-rewrites/


r/MicrosoftFabric • • 2d ago

Discussion Fabric Training

5 Upvotes

I would really like better free trials for Fabric. Individuals struggle to gain access, and the free trial is too short. They should allow you to practice on small sample datasets. It is hard to convince people how good it is without access to it. It needs a better free trial model, or they should allow low-usage users to learn, practice, and get certified. What do you think? The free trial is not enough.


r/MicrosoftFabric • • 3d ago

App Development claims.role population for a Fabric App

4 Upvotes

Can claims.role be used to manage differnt roles for a Fabric App ?


r/MicrosoftFabric • • 3d ago

Administration & Governance Lakehouse Visibility + OneLake Security

5 Upvotes

Is there anyway to make a lakehouse visible in Onelake Catalog in Excel/PowerBi without giving the user Viewer access to a workspace?

For example - we have a workspace with multiple lakehouses. These specific users only require access to a specific schema in one of those lakehouses. With Entra + Onelake security I can configure the access fine to the schema in the lakehouse - but the only way they can access it is if they are given the SQL Connection String + DB name unless they are given Viewer access to the workspace - but I dont want or need them to see the other workspace items (incl lakehouses)


r/MicrosoftFabric • • 3d ago

Data Factory Pipeline Feedback :)

14 Upvotes

Always glad if Fabric gives structural and working feedback for better performance 😄


r/MicrosoftFabric • • 3d ago

Data Engineering Shortcut Transformations

5 Upvotes

Hi,

We have been testing Shortcut transformations and the schema inference is blocking us form using them.

I see the roadmap improvements are currently months behind schedule, do we have any view on when they will be available? I'd like to reduce our bronze ingestion code by using them but at the moment we cannot.