r/bathrooms • • 21h ago Bravo

Contemporary Bathroom Remodel

Thumbnail
gallery
39 Upvotes

r/bathrooms • • 12h ago

Bathroom remodel — questions I get asked all the time, answered (from a NYC contractor)

10 Upvotes

I'm a general contractor in Brooklyn — I run Zani Construction NYC — and I've remodeled a lot of bathrooms. Here are the questions homeowners ask me most, with straight answers.

**Where do you start?**

With the layout and the fixtures, on paper, before anything gets demolished. Decide where the shower, toilet, and vanity go, and pick the actual fixtures — their sizes decide the plumbing, the tile layout, and the electrical. A plan made after demolition is a plan made twice.

**Do I need approval from my building?**

In most co-ops and condos, yes. The board or management usually wants to approve the work before it starts, sets the working hours, and asks for insurance and paperwork from your contractor. Get that in motion early — it takes time and it sets your start date.

**What's the order of work?**

Design and approvals first, then order everything, then demolition, plumbing and electrical rough work, waterproofing, tiling, fixtures, and finishes. The step people skip is waterproofing — and it's the one that matters most. A bathroom that looks perfect but leaks behind the tile is a much bigger job later.

**How do I choose tile?**

For how you'll live with it. Shower floors need grip when wet, walls need something easy to wipe, and grout lines collect dirt, so bigger tiles mean less cleaning. Bring home samples and look at them in your own bathroom light, not just the showroom.

**What surprises come up in older New York bathrooms?**

Plumbing and wiring that are older than they look, walls and floors that aren't straight, and space that's tighter than the drawings suggest. None of it stops a job — but it all needs to be in the plan, with a cushion in the budget, before the walls come open.

**Can I use the bathroom during the remodel?**

No — once demolition starts, that bathroom is out of action until the end. If it's your only bathroom, plan for that before the start date, not after.

**What's the one thing you'd never skip?**

Waterproofing, done properly, and a contractor who shows you the work behind the tile before it gets covered up.

Happy to answer questions if you're planning one.


r/bathrooms • • 14h ago

Bathroom Set Up?

Post image
4 Upvotes

We have this large closet in our basement and I’m curious if this is set up for a future bathroom? That’s a water line hanging on the right


r/bathrooms • • 1h ago

Has anyone seen shower faucets like this?

Thumbnail
gallery
2 Upvotes

My diverter has kicked the bucket but finding a replacement has been such a pain. Anyone have any tips? I’d appreciate any input!


r/bathrooms • • 4h ago

Old bathroom mat

Post image
1 Upvotes

r/bathrooms • • 13h ago

Opinions on bath alcove reno pleas

Thumbnail reddit.com
1 Upvotes