I have an older steel shed in Canberra, roughly 1-1.5-garage size, with a floor of uneven pavers and gravel base. Ive insulated the walls and ceiling but want to try and get it to a flat, dry floor. Exploring lifting the pavers and have a reinforced slab poured inside the standing shed, over a membrane.
If you've done this in the Canberra region, I'd be grateful to hear:
- Who did the work, and would you use them again?
- Roughly what it cost and how big the floor was
- How they kept the concrete off the steel wall sheets and isolated the frame posts
- Whether they excavated to keep the floor level low (my eaves are only about 2 m, so I can't afford to raise the floor)
- How concrete got in: barrow or pump
- Any problems since: cracking, damp, water coming in under the walls, rust at the base of the sheets
- Whether you needed any approval or a certifier's exemption
Also keen to hear from anyone who decided against a slab and re-laid pavers or did something else, and whether you regret it.
Nothing until the new year, so I'm just scoping for now. Thanks.