r/estimators • • Oct 22 '21 Bravo

Looking to hire an estimator? Are you an estimator looking to make a move? Post here!

120 Upvotes

r/estimators • • 2h ago

Does anyone else feel like they're not progressing enough in their career?

3 Upvotes

Have you ever felt like you're still nowhere in your career, even after working for years? Like someone new could join, learn everything you know in a much shorter period and eventually become better than you?

In my team, I have 2 years of experience, while my two seniors have around 15 years each. Sometimes I feel disappointed when I'm not involved in certain discussions or tasks, even though I understand that I lack experience in those areas.

I want to learn more, but I feel stuck doing the same work repeatedly without much professional growth.

There's also this constant fear of not being good enough or falling behind others.

Has anyone else experienced this? Is it a lack of confidence, impostor syndrome, or a genuine lack of career growth?

How did you overcome this feeling, and what actually helped you move forward?


r/estimators • • 4h ago

Do experienced MEP estimators take notes of everything they learn?

3 Upvotes

one thing I've noticed is that I tend to forget a lot of project details once I move on to the next project.

While working on a project, I understand the specifications, materials, technical requirements and quantities. But once the project is completed, if someone asks me something about it later, I often have to go back and check the documents again.

Sometimes, even things I've learned from previous projects don't immediately come to mind.

Do experienced estimators maintain a personal Excel database or notebook for things like material specifications, pipe grades, pressure ratings, pricing, labour productivity and lessons learned from each project?

Or does all this knowledge naturally stick with you as you gain more experience?

How do you retain and organise your technical knowledge while constantly working on different projects?


r/estimators • • 11h ago

What is possible for salary progression?

6 Upvotes

Making 75k a yr as a junior estimator in industrial construction. Some of the guys who make more, joke about not making enough as a PM/ Estimator. It may just be my company. Just seeing what’s possible for the future. I do expect to make 6 figures in 3-5 yrs.


r/estimators • • 4h ago

MEP Estimator with 2 years of experience but no pricing knowledge – Am I falling behind?

1 Upvotes

I've been working as an MEP Estimator in the UAE for the past 2 years, but I still haven't been involved in the actual pricing side of estimation. That's mainly handled by my two senior estimators.

My current responsibilities include:

  • Reviewing tender documents, drawings, BOQs and specifications.
  • Cross-checking equipment schedules with the BOQ.
  • Identifying the materials and technical requirements for each system.
  • Taking quantities for HVAC, plumbing, drainage and firefighting using PlanSwift.
  • Preparing Excel quantity takeoff sheets.
  • Comparing takeoff quantities with BOQ quantities and making the necessary adjustments for internal costing.

Once this is done, I send everything to my seniors, who handle the pricing.

The problem is that I'm always occupied with quantity takeoffs and tender deadlines, and my seniors are equally busy. So I rarely get an opportunity to sit with them and understand the pricing process.

Basically, I have decent technical knowledge and quantity takeoff experience, but very limited knowledge of material rates, labour costing, productivity, overheads, profit margins and final tender pricing.

I'm planning to switch companies in the near future, and I'm worried that this gap in my knowledge might affect my career growth.

Is this normal for someone with 2 years of experience in MEP estimation, or am I falling behind?

How can I learn the pricing side independently? Are there any useful resources, courses or practical methods you would recommend?


r/estimators • • 8h ago

Follow up on my line item pricing post, the replies changed one thing and only one thing

1 Upvotes

My post about quitting line item pricing got more fight than anything I have put on here. Fair points too, especially from the owners side comparing bids. I did not go back to pricing every line. What I did change is my scope got even more detailed. Quantities, inclusions, exclusions, all written down tighter before we start, because half the people arguing with me were really arguing about vague scopes, not about the pricing format. The numbers are still all in my file. I am still not handing them out as a menu to be shopped line by line. For the folks who do lump sum, how detailed is your scope on a mid size job? Still curious where that line sits.


r/estimators • • 19h ago

How do you catch galvanizing and delegated design on misc steel bids before they bite you?

7 Upvotes

Chicago steel estimator here, mostly structural and misc. The two things that have cost me most over the years aren't the tonnage. They're galvanizing buried in a spec section nobody reads, and delegated design (stairs, rails, canopies) where the fabricator ends up owning the engineering and the stamp.

My routine now is to search the spec book for "galv," "hot-dip," "delegated," "performance," and "PE" before I even open the drawings. Then I flag every exterior piece on the architectural and landscape sheets, because site steel like bollards, rails and trash enclosures often comes galvanized without anyone saying so on the structural set.

What do you all do? Do you carry delegated design as a separate line or an exclusion? And do you price galv by the pound, or get a quote every time?


r/estimators • • 19h ago

Planswift licence activation trouble today

3 Upvotes

Does anyone have this problem today?
Planswift support is terrible with Ai answering the calls. It's already 9:20am Eastern time and it says to call back during business hours of 8am...


r/estimators • • 1d ago

What did you do before you were an estimator?

7 Upvotes

I’m curious how people got into estimating. What were you doing before you became an estimator? Did you come from the field, go to school, or take a different path? Who taught you how to estimate, and did you estimate in another trade or industry before moving into the one you’re in now?

I’d love to hear how you got your start.


r/estimators • • 1d ago

Hard number vs budget number

7 Upvotes

There is a small airport project I am estimating right now, and my manager wants to submit a hard number.

However, the drawing are only 67% completed and I am very hesitant to give them a hard quote for that.

Usally I prefer to use "this quote is for budget purpose only" but yeah as I said, my manager wants to submit a hard number.

My question is when it's make sense to leave" budget purpose" line on quote?


r/estimators • • 21h ago

Do you guys actually use any software for chasing supplier quotes, or is it still just email and Excel?

0 Upvotes

Keep seeing threads here about lighting and material suppliers dropping quotes 15 minutes before bid time and forcing people to use plug numbers.

For anyone dealing with this every week, do you actually use any software to send out RFQs and track vendor quotes, or is everyone still just doing BCC emails and calling reps? What's the biggest headache with whatever setup you're using right now?


r/estimators • • 1d ago

Visualizing and imagination is the key to estimating!!

0 Upvotes

The technology today is awesome.

If you have a renovation project and you get to walk through that site, without even moving from your table, wouldnt that be awsome!?

The technology today lets you do that. I dont know how many of you are familiar with matterport, but it lets you do that.

Before peeking the plans, if you really get the real picture on-site, in your mind, the lines on the drawing set gets much easier to your imagination.

You get the exact idea which item goes to Linear and which goes to Area.

For those of you who have never get to use one of these, I ll be posting that link here for you so you may go through that and see how it really helps you make a site visit, from an estimator's perspective, all while sitting at your desktop.

https://my.matterport.com/show/?m=Arh1JMPsmvi


r/estimators • • 2d ago

Small GC in the Greater Toronto Area need advice

5 Upvotes

So I am the only estimator at my company, and I have been with this company for 3.5 years. Saw it grow from basement renovations to taking on multimillion dollar contracts. However, there is a problem.

We (me) have begun to bid on public projects (about 2 projects a week) and I am losing my mind reaching out to subcontractors, and running around for quotes. I have a bidders list and I essentially just send emails one by one for each and every trade I need for every project. I send out about 200-300 quote request emails a week. Not to mention the 2 hours before bid closing is like an apocalypse in my email box, with quotes flooding in every 2-3 minutes. Trying to level them, clear up misunderstandings, and adjusting my numbers is definitely quite the task.

Im no genius but this does not seem like an efficient usage of my time and energy, and I don't think this is how big successful GC's do it.

So can you guys please tell me how I can streamline my process? This includes finding subcontractors, sending them quote requests, collecting quote requests, and levelling everything

Thank you


r/estimators • • 2d ago

Should I accept Estimator job offer

5 Upvotes

Hello. I was recently recruited to be an estimator. I have a background in construction, but very little experience with estimating. They're starting me off as like a trainee, and then will hire me full time. It's a decent wage for a trainee position in my area. It's commercial, union affiliated electrician. Just wanted to ask this sub if it's still a good time to become an estimator, threats with job security, AI etc. all advice appreciated :) Especially if you do commercial electrical estimating!

Edit: Also appreciate insight on job growth and career paths you can take from starting as an estimator. I have a degree but it is not related to construction


r/estimators • • 2d ago

Is construction estimating a good career in Canada?

0 Upvotes

Hey everyone!

I’m considering a career in construction estimating and would love to hear from people who are currently working as estimators in Canada.

I have a few questions:

- Why did you choose to become an estimator?

- What does your day-to-day work look like?

- What do you enjoy most about the job?

- Do you feel you’re fairly compensated for the work you do?

- How much can a construction estimator realistically earn in Canada, especially at the entry level? What about after a few years of experience?

- How would you describe your work-life balance and overall quality of life?

- Would you recommend estimating as a career to someone just starting out? What are the pros and cons?

I’d really appreciate hearing about your personal experiences, especially from those who started out with little or no experience in the industry.

Thanks in advance for any advice or insights!


r/estimators • • 2d ago

They said AI will takeover your Job, Not if you adapt!

0 Upvotes

AI became a great tool for those who know how to use it and when to use it.

A human input and quality Control will always still be needed.

I see alot of softwares who are training there AI models to do the sluggish part of takeoffs. But honestly, me as a senior estimator can never trust the AI completely. A second set of eye will always be needed to do the final checkups and reparing the final cost analysis.

Do you think that AI can match two deep down pages of sectional details and corresponds that to the plan exactly and measure the exact qty. in the required unit of meaurement? In my exposure till now, I couldnt get the reliability of AI with this.

But, there are some trades where AI tool like gpt, rocks. For example, counting the storefronts and windows and preparing the detailed excel sheet with their pricing and data analysis to find the corresponding frames, U-values, solar gain coefficient values for glazing etc.

Hence, our go to Action would be to adapt to AI usage as a tool. Not something you are competing against, its something you are using to compete...


r/estimators • • 2d ago

Takeoff check: measure one printed dimension on every sheet before you trust the scale

0 Upvotes

Before counting or measuring anything on a sheet, measure one dimension that is printed on it, like a column grid or a door width, and compare it to the stated scale.

Disclosure: I work at Ruh AI, which makes takeoff and estimating software. No links, nothing to sell, just a habit worth stealing.

If the two don't match, the sheet was usually resized when someone printed or exported it. What helps from there:

  1. Recalibrate off the longest printed dimension on that sheet, not a short one, so the error stays small.
  2. Write the sheet number and the dimension you used in the takeoff notes, so the next person can check it.
  3. If a sheet has no scale and no printed dimensions, don't measure it. Ask the question before bid day.

Detail sheets catch people most, because one page can carry three or four scales.

Which sheet types burn you most often, and do you check every sheet or only the ones that look off?


r/estimators • • 3d ago

Them some tight tolerances for ye olde 3Form guardrail panels..

Post image
24 Upvotes

Maaaaybe we cut these on the CNC lol


r/estimators • • 2d ago

Quick question for estimators:

0 Upvotes

Would you use a tool that automates quantity takeoffs and generates a BOQ exactly in the format your client expects?
We’re building Kutch, an AI-powered tool that does just that, while keeping every measurement visible, verifiable and editable.
Would you be interested in trying it? I’d love to hear your thoughts!


r/estimators • • 3d ago

Please help. What trainings are to be expected at entry level?

6 Upvotes

I have been an estimator for 2 years. I worked for one conpany for a year where they trained me. No one came from the field. And they only had to explain something once. They took the time.

I came to a larger company hoping for a mentorship (or i would never have left)

I barely get work. I have been sent to 0 trainings. Its been a year. All i hear is how my lack of field knowledge makes me not as adequate. Something clear on my resume, and also the other company i worked for never cared for. I found out people in my company have been sent to several trainings. I do not think this matters, but i am the only female on my side besides someones wife.

Estimators, during your first years ? Especially ones who are only ten years in, what sort of training did you receive. From computer, to negotiation, to product.

I want to know what i should expect truly?


r/estimators • • 3d ago

Is it better to ask for clarity or just assume and say, "If they don't like it, it'll be a change order"...?

3 Upvotes

Am I bothering people with my nit picky questions that only I have? I always have so many questions, and my boss says, just assume... but my other boss says, "it's gotta be in there somewhere..." and off he goes looking.


r/estimators • • 4d ago

Made a bad mistake… what are some of yalls worst mistakes?

45 Upvotes

Hi all,
I just turned a bid last week. I was about to head home for the day when I decided to just glance through my low quotes one more time. I had plugged in a concrete bid that hadn’t included any SOG reinforcing worth about a million dollars. I misread his quote and thought “unreinforced” said “reinforced”. I feel like an imbecile. This is by far the worst mistake I’ve ever made as an estimator. Wanted to start a thread to help make me feel better by hearing some of yalls worst misses, and how you recovered.


r/estimators • • 4d ago

Estimators, Which Software are you using ?

9 Upvotes

Hello Estimators,

I am working from 11 years for division 28, but just discovered that many of estimators are using softwares for estimation, like planswift, simpro, trimble and all, i am in the process to check all the softwares, which i was not aware for whole of my life, i appreciate your opinion on which software should i start with and make my daily working buddy , and how do you guys get these softwares its, hell expensive, can i get any free version , please help.

Thank you


r/estimators • • 4d ago Bravo

What will estimating look like with AI in the near future?

4 Upvotes

It can either be 2-5 years or 5-10 or 10-15 years from now. Will AI reduce the number of estimators needed in your company? Let’s say you can upload plans, specs and production sheets into Claude and it gives you a bid schedule and made up crews based of you would bid a certain bid item. All you need to do is a bid review and ensure it aligns how you would’ve bid it so now you went from looking at an estimate/plans from weeks to a couple of days (maybe hours???). Now your boss wants you to bid x100 more projects. What do yall think? I’m sure enough takeoff engineers and estimating administrators will be reduced.