r/industrialengineering • • 19h ago

Upcoming 2027 grad trying to transition into more Business-Related roles with ISE degree

5 Upvotes

Hey all. Graduating in spring 2027 with a double major in Industrial & Systems Engineering as well as Economics. 1 internship under my belt just this past summer for an aerospace company for about 4 months.

Idk what category my internship falls under.​ Officially I was an Industrialization engineering intern tasked with manufacturing 4.0 efforts (or so they said), but I did everything from project management, to continuous improvement, to production planning and capacity management, manufacturing engineering, quality engineering, facility layout optimization, etc. Well-known company but my department was small and under-staffed, so they basically treated me as a full-time.

Point is, all in all, I think I got a well-rounded experience and learned a whole lot, which was awesome for my very first internship and exposure to industry. Unfortunately, could not see myself doing any of that for my future. I have always loved business (hence the double in econ, would've loved finance too), and I'm hoping after I graduate I can try it out and get a job.

It's obviously a broad field, and I have a hard time selling myself, so I was wondering if someone with an IE/ISE degree could give some input if they have ever done a similar transition (and also what is ur role if u did do so)? Any of these skills you feel would be transferable? Thanks :)


r/industrialengineering • • 2h ago

Documenting CI projects as you go saves a ton of headache later

3 Upvotes

Something I wish I had started doing earlier in my career is keeping all the pieces of a DMAIC or DMADV project in one place while I'm actually running it. It's way too easy for a project to turn into a Word charter, a few different Excel files, Minitab charts nobody else can open, and a rushed PowerPoint at the end, and then six months later when you need it for a performance review, handoff, or interview you're digging through shared drives trying to figure out what your baseline even was. Spending five minutes a week keeping your baseline numbers, dates, main chart, root cause, and control check together as you go saves you from having to rebuild the whole story from scratch later.