r/projectcar • u/Propwashed • 8h ago
My SRT-Minivan update
Been slowly working on the van so figure I would give another update
Motor is almost ready to go in. A few things left to do on the motor before it goes in but it’s getting close
Working on the new brake lines now. Had to switch out the van brake master cylinder for a Neon one. The van was was almost the size of a pizza and took up too much room. Plus the Neon one has a spot I can run the clutch master hydraulic line to. Also took the stock proportioning valve out and swapped in a Wilwood one. Had to make all new lines for the front brakes and lines running from the brake master to the proportioning valve.
Once the motor goes in have to hook up all the lines and get all the electrical hooked up. Also have to run a new fuel pump since the factory van one won’t be enough pressure.
Also doing a battery relocation kit to make some more room in the engine bay.
I’ll keep the updates going if people are interested