r/ISRO • u/DryPhilosopher5937 • 16h ago
Career opportunities for MBBS passouts at ISRO?
Is there really any effective kob roles at isro after completion of mbbs , do they reqd a Phd , if reqd , what should be the streams...?
r/ISRO • u/DryPhilosopher5937 • 16h ago
Is there really any effective kob roles at isro after completion of mbbs , do they reqd a Phd , if reqd , what should be the streams...?
r/ISRO • u/Pristine_Demand_50 • 19h ago
I am looking for guidance regarding this job. Actually I am currently preparing for it, my background is a civil engineer. Can you please help me how to prepare for the written test and skill test. What resources should I prepare for this and the syllabus. I know it's diploma level but sometimes I confuse.
Can you please provide me help in this
r/ISRO • u/pantshash • 19h ago
ISRO successfully carried out a long duration ignition test of the Gas Generator subsystem of the high thrust LOX Methane engine at the test facility located at ISRO Propulsion Complex, Mahendragiri for a duration of 200 seconds on November 14, 2026. The high thrust LOX Methane engine is being developed by the Liquid Propulsion system Centre (LPSC) of ISRO with the participation of other Centres like Vikram Sarabhai Space Centre (VSSC) for the Next Generation Launch Vehicle.
An optimally designed Gas Generator is one of the important milestones in the development of a liquid rocket engine and produces high pressure and high temperature gas by burning propellants which drives a turbine tat power the turbopumps to deliver the liquid propellants into the thrust chamber. The Gas Generator was fabricated through additive manufacturing at Indian industry.
The test simulated a steady state Gas Generator chamber pressure of 31.5 bar corresponding to an engine thrust level of ~60%. During the test, smooth ignition and stable combustion were demonstrated. Design adequacy of the hardware for the 60% operating condition has been demonstrated in the present hot test.
The hardware will be further used for proving design adequacy at different operating conditions.Another major milestone was also achieved on November 12, 2026 wherein the the first cold flow test of the LOX pump assembly was carried out successfully as part of test evaluation of the non-cavitation and cavitation characteristics of the pump assemblies for integrated engine.
The pump hardware was earlier successfully spin tested to the maximum operating speed. Pump performance parameters are in line with prediction for integrated engine.With the above tests, major sub-systems of the high thrust LOX Methane engine including spark torch ignition system, scaled thrust chamber, full-scale Gas Generator and LOX pump have successfully completed the development test campaign.
Request For Proposal For Design, Engineering, Supply, Installation, Testing & Commissioning Of Fluid Storage And Stage Servicing Systems For Tlp Project At Sdsc Shar, Sriharikota
Detailed layout of Third Launch Pad
NGLV variants and LMLV configuration:
NGLV ( LM700 + LM250 + C32N )
NS1 (LM700) Stage config:
NS2 (LM250) Stage config:
NS3 (C32N) Stage config:
NGLV-H ( LM700 + LM250 + C80 )
NS1 (LM700) Stage config:
NS2 (LM250) Stage config:
NS3 (C80) Stage config:
LMLV ( 3×LM700 + LM450 + C80 )
3× LS1 (LM700) Stage config:
LS2 (LM450) Stage config:
LS3 (C80) Stage config: