r/PowerSystemsEE • • 12h ago

Summer 2027 P&C internship advice

3 Upvotes

Undergrad EE in the US, previously interned in transmission planning at a utility. Looking to get into protection and controls for next internship in summer 2027. Having difficulty finding the roles to apply to. I’ve applied to a bunch of general power systems jobs that align with my previous internship, but so far only one pre-recorded interview (rejected) and no offers. Is it not hiring season for interns in P&C yet, or can someone point me in the right direction? I would also appreciate any general advice, thank you!


r/PowerSystemsEE • • 22h ago

Just got hired to a big utility. I have no idea what im doing, any advice?

9 Upvotes

I got the internship and since the job market is hell I signed the full time offer after college. It is for protection and controls engineering relay design. I enjoy it, its nice seeing a project you made be built. My plan is to soak up all the knowledge I can get and become a decent engineer. The job seems cushy tho. Any advice for me?


r/PowerSystemsEE • • 5h ago

How we stopped losing scope-of-work fights on site: the 1-page numbered Claim Sheet

2 Upvotes

On overseas EPC projects, the worst money losses rarely come from bad engineering — they come from "verbal site instructions" that turn into "that was always in your scope" six months later.

What actually saved us across 100+ extra items (numbered #110 to #210): we banned verbal work without a same-day, 1-page numbered Claim Sheet listing who instructed it, date, scope, and rough quantity — plus a simple yes/no scope query (e.g., "fire-stopping the GIS wall penetrations is ours, brick infill is Owner's — please confirm").

No acknowledgement receipt = it never happened. How do your teams lock down gray-area scope on site before closing the work?