So I paint homes/commerical properties in the Socal area. I have not been doing this for long which is why I'm curious here.
So my interactions with customers/clients almost always go much smoother. I review spec, give a quote, communication is usually decent. If the price is a bit out of their budget we can sometimes meet somewhere in the middle. And they are simply appreciative.
With contractors, there is a vibe I detect that they have very little respect for me or my time. It's hard to articulate, but it reminds me of when I used to do labor/grunt work and how the people who would hire me behaved.
I post ads (politely) requesting (multiple) venues of contact (which are often ignored by contractors). I have to pull teeth to often get the full scope and some are very weird about quotes. I'm repeatedly running into contractors who are trying to rope me into hourly low pay opposed to standard fee while nitpicking and trying to define how long they think something should take.
What's going on here? I just got off the phone with a guy who first did not contact me in the way I requested on my ad. Then when I inquired over message what he needed done he refused to give any details, no measurements, no sqft, no details, no pictures. Just, "it's a new build studio that needs painting". This is not the first time this has happened.
I get on the phone with him and all of a sudden what do you know, the contractor actually does have the details and it turns out it's not actually "just a studio" but a one bedroom, two bath ADU with a 3 car garage (whoops).
He then aggressively trys to get me to give him a number on the spot asking me passive aggresive comments like "are you an actual painter or some salesman" then says thanks and hangs up the phone after I give me my price range.