r/Contractor • • 10h ago

Painter trying to figure out if my interactions with contractors is normal behavior from them?

11 Upvotes

So I paint homes/commerical properties in the Socal area. I have not been doing this for long which is why I'm curious here.

So my interactions with customers/clients almost always go much smoother. I review spec, give a quote, communication is usually decent. If the price is a bit out of their budget we can sometimes meet somewhere in the middle. And they are simply appreciative.

With contractors, there is a vibe I detect that they have very little respect for me or my time. It's hard to articulate, but it reminds me of when I used to do labor/grunt work and how the people who would hire me behaved.

I post ads (politely) requesting (multiple) venues of contact (which are often ignored by contractors). I have to pull teeth to often get the full scope and some are very weird about quotes. I'm repeatedly running into contractors who are trying to rope me into hourly low pay opposed to standard fee while nitpicking and trying to define how long they think something should take.

What's going on here? I just got off the phone with a guy who first did not contact me in the way I requested on my ad. Then when I inquired over message what he needed done he refused to give any details, no measurements, no sqft, no details, no pictures. Just, "it's a new build studio that needs painting". This is not the first time this has happened.

I get on the phone with him and all of a sudden what do you know, the contractor actually does have the details and it turns out it's not actually "just a studio" but a one bedroom, two bath ADU with a 3 car garage (whoops).

He then aggressively trys to get me to give him a number on the spot asking me passive aggresive comments like "are you an actual painter or some salesman" then says thanks and hangs up the phone after I give me my price range.


r/Contractor • • 5h ago

How should I go about lead generation?

3 Upvotes

Starting from the ground up. We have a few years of old jobs to show off, but not sure how to go about it. What should I be mentioning when I talk with designers about referring me? What is and isn’t a waste of my time when looking for leads. Examples would be great.


r/Contractor • • 2h ago

Ontario contractors: how do you collect subs' BN, GST/HST and WSIB clearance before paying them?

1 Upvotes

For those of you who hire subcontractors: when a new sub starts, how do you get their business number, GST/HST number and WSIB clearance before the first payment?

Do you ask upfront, have your bookkeeper chase them, or end up scrambling at T5018 time? And do you re-check WSIB clearances every quarter?

Curious what actually works for people.


r/Contractor • • 2h ago

Jobber - Replying to a Request

Thumbnail reddit.com
1 Upvotes

r/Contractor • • 5h ago

What I put on every invoice, and why I write change orders down before I do the extra work

1 Upvotes

I'm a contractor in Kentucky. I do electrical and install work, things like temp power poles, water heaters, and dishwashers.

When I first started I was mostly just taking a check or Venmo after we agreed on a price. That works until a customer asks for a real invoice, or until the job changes midstream and nobody wrote it down.

Here's what I put on every invoice now:

  • My business name, phone, and email
  • Invoice number and date
  • Billing address and the job site address, because those are not always the same
  • A plain-language description of the work, with labor and materials broken out
  • Tax if it applies
  • Total due, how they can pay, and when it's due
  • Any payments already received and the balance left

The other habit that saves arguments: if the customer asks for something that was not in the original price, I write it as a change order before I do the work. What changed, what it costs, and I get them to sign it or at least confirm it in a text or email. A verbal "yeah go ahead" is how you end up fighting about it later.

You can do all of this in a simple spreadsheet or a fillable PDF. It does not have to be fancy software.

What else do you all put on yours that I should add?


r/Contractor • • 20h ago

Insulation Question

Thumbnail
gallery
0 Upvotes

Contractor here. I have a client that needs insulation behind an existing manifold wall on a post frame building. The plywood is mounted between two posts so I can’t get in from the side. Only top down is open. What are my options here. Would like to be able to have an adequate vapor barrier as well.