r/Contractor • • 2h ago

Ontario contractors: how do you collect subs' BN, GST/HST and WSIB clearance before paying them?

1 Upvotes

For those of you who hire subcontractors: when a new sub starts, how do you get their business number, GST/HST number and WSIB clearance before the first payment?

Do you ask upfront, have your bookkeeper chase them, or end up scrambling at T5018 time? And do you re-check WSIB clearances every quarter?

Curious what actually works for people.


r/Contractor • • 2h ago

Jobber - Replying to a Request

Thumbnail reddit.com
1 Upvotes

r/Contractor • • 5h ago

What I put on every invoice, and why I write change orders down before I do the extra work

1 Upvotes

I'm a contractor in Kentucky. I do electrical and install work, things like temp power poles, water heaters, and dishwashers.

When I first started I was mostly just taking a check or Venmo after we agreed on a price. That works until a customer asks for a real invoice, or until the job changes midstream and nobody wrote it down.

Here's what I put on every invoice now:

  • My business name, phone, and email
  • Invoice number and date
  • Billing address and the job site address, because those are not always the same
  • A plain-language description of the work, with labor and materials broken out
  • Tax if it applies
  • Total due, how they can pay, and when it's due
  • Any payments already received and the balance left

The other habit that saves arguments: if the customer asks for something that was not in the original price, I write it as a change order before I do the work. What changed, what it costs, and I get them to sign it or at least confirm it in a text or email. A verbal "yeah go ahead" is how you end up fighting about it later.

You can do all of this in a simple spreadsheet or a fillable PDF. It does not have to be fancy software.

What else do you all put on yours that I should add?


r/Contractor • • 5h ago

How should I go about lead generation?

3 Upvotes

Starting from the ground up. We have a few years of old jobs to show off, but not sure how to go about it. What should I be mentioning when I talk with designers about referring me? What is and isn’t a waste of my time when looking for leads. Examples would be great.


r/Contractor • • 10h ago

Painter trying to figure out if my interactions with contractors is normal behavior from them?

11 Upvotes

So I paint homes/commerical properties in the Socal area. I have not been doing this for long which is why I'm curious here.

So my interactions with customers/clients almost always go much smoother. I review spec, give a quote, communication is usually decent. If the price is a bit out of their budget we can sometimes meet somewhere in the middle. And they are simply appreciative.

With contractors, there is a vibe I detect that they have very little respect for me or my time. It's hard to articulate, but it reminds me of when I used to do labor/grunt work and how the people who would hire me behaved.

I post ads (politely) requesting (multiple) venues of contact (which are often ignored by contractors). I have to pull teeth to often get the full scope and some are very weird about quotes. I'm repeatedly running into contractors who are trying to rope me into hourly low pay opposed to standard fee while nitpicking and trying to define how long they think something should take.

What's going on here? I just got off the phone with a guy who first did not contact me in the way I requested on my ad. Then when I inquired over message what he needed done he refused to give any details, no measurements, no sqft, no details, no pictures. Just, "it's a new build studio that needs painting". This is not the first time this has happened.

I get on the phone with him and all of a sudden what do you know, the contractor actually does have the details and it turns out it's not actually "just a studio" but a one bedroom, two bath ADU with a 3 car garage (whoops).

He then aggressively trys to get me to give him a number on the spot asking me passive aggresive comments like "are you an actual painter or some salesman" then says thanks and hangs up the phone after I give me my price range.


r/Contractor • • 13h ago

Anyone else triggered by this?

0 Upvotes

Hi all,

I had a potential client, he is the same age as me. He kept calling me buddy, even after I introduced myself and my role in the company. Buddy this, thx buddy, random emojis. Is this just me or this is extremely disrespectful?


r/Contractor • • 20h ago

Insulation Question

Thumbnail
gallery
0 Upvotes

Contractor here. I have a client that needs insulation behind an existing manifold wall on a post frame building. The plywood is mounted between two posts so I can’t get in from the side. Only top down is open. What are my options here. Would like to be able to have an adequate vapor barrier as well.


r/Contractor • • 1d ago

Business Development Looking for a little business/ life advice / guidance.

3 Upvotes

Tldr at bottom

I started a side hustle cleaning service (mainly exterior cleaning- pressure washing, windows, solar panels).

My real job pays a solid hourly middle class wage and is 3 12 hour shifts a week. But it’s annoying being a cog in the wheel with no growth. It is not in construction and I cannot really start a business with it.

I’ve been in business 2 months with some success- thousand dollar job every month, one $600 job every 2 weeks with a convenience store (contract). A $300 job every 3 weeks or so. Those numbers aren’t bad by any means.

Enter general contractor-
They need windows cleaned for a large custom home. $5600 (finished)
They need the stubborn decals removed from the frames- $7k (in progress)

They’ll likely need a final window cleaning for the customer to move in - Likely another 5k (or more)

So I’m here looking at potentially 17k for like 6 weeks work. Not too shabby considering it’s mainly labor cost (and I’m doing the labor).
So here’s my question to you guys -
Do I try to pivot my business model to do more of this type of work (new construction cleanings) or was this just a unicorn type of job? I’m absolutely busting my ass and people have noticed (but that doesn’t necessarily mean I’ll get referrals/more work based on my previous customers)

Presumably the margins for the other contractors also this good? Which leads to my next question of- should I just learn a trade instead? Should I just offer to work with the GC that hired me? (He’s a nice guy).

At the end of the day I’m looking to build something that can earn me some decent money once it gets larger.

TLDR- my side hustle window cleaning service got hired by a GC for a large custom home. The money has eclipsed all my other jobs/income. Do I try to get more of this type of work, just enter a trade (presumably similar margins for the other guys too?) or just stay the course with my $300-1000 jobs here and there?

Thank you for any advice.

.


r/Contractor • • 1d ago

How long is too long to wait for siding?

0 Upvotes

We had a big storm last March that ripped some siding down. Put a deposit down in July after contractor fought with my insurance company to get the whole house done. Great. Awesome. Here’s the issue. First they said early to mid September. Then early to mid October. Then again early to mid November. Now they’re telling me not till next year. I got pissed off and asked for my deposit back but was that the right move or is this normal? If they had said hey we’re scheduling 6 months or whatever out ok cool. I get it. But it just keeps getting pushed. Thoughts?


r/Contractor • • 1d ago

Interior design Company stopped work after delay

Thumbnail reddit.com
1 Upvotes

Hi All,

I bought a 2BR house in Secondary market. Later even my sister liked a Ground floor with Garden and bought.

We hired the same contractor to do interior works for both the house.

The work started with an agreement mid June with phase Based payment plan. The NOC from the building was for 3 months. Work delayed We extended.

The contractor said lot of things in beginning but delayed the work with very bad quality and products. His staff kept changing. His Excuse was due to the current situation materials and not available and price has increased.

He used to hire people to get work done on 3rd party basis.

Workers did not come for weeks.

Finally yesterday he got offended over whatsapp and asked the team to leave the whatsapp Group and stop the work.

Even though it was phase Based payment we paid more as he kept asking. We paid more than 80% where in not even one specific work is finished!

What is the best we can do in this situation? We bought the house with High hopes and now We are in this mess.


r/Contractor • • 1d ago

Do not work with DANIEL REEVES with Verde Builders/Austin,TX Home Builder

Thumbnail gallery
0 Upvotes

r/Contractor • • 1d ago

Window Failure During Nor'Easter

Thumbnail
gallery
1 Upvotes

Clearly, the failure point's outside, but the window leak area is ~20' above the ground, over a very non-level yard. Point being, I'm not going up on a ladder with the wind howling when I'm not sure I could even find or address the failure point.

Couple questions:

  1. Shouldn't the horizontal strip right above the window pop off? (You can see where I've bent it trying to pop it off, in pic 3.) I feel like there's a lot of retained water in there & I'd like to better control where it's going to leak into the house.
  2. Am I losing my mind, or is that casing drywall? Sure isn't wood, which is what I would have expected it to be.

At the moment, I taped up some cling wrap just below where the water's coming in & created a water slide, so the water ends up contained in a bucket on the floor.

I have 4 of these windows on the north-facing side of the house, and 2 more on the east. Figure I'll get them all replaced at the same time, plus a 5' sliding door onto my deck on the east face. I'm thinking it's gonna run ~$15k for this. Thoughts on that price? We're moving in 9 months, so I'm buying top-shelf windows, just nice enough to not bring down the house price. Recouping the cost isn't even a consideration.

Thanks!


r/Contractor • • 1d ago

F L X Building Contracting LLC · 312 Damascus Street - near Al Qusais Plaza - Al Qusais Ind. Second - Al Twar 5 - Dubai

Thumbnail
g.page
0 Upvotes

FLX Building Contracting LLC is a Dubai-based contracting company specializing in structural strengthening, concrete repair and restoration, injection works, post-tensioned concrete repairs, and protective systems. Based in Al Qusais, Dubai, we provide specialized construction and structural rehabilitation solutions for residential, commercial, and industrial projects across the UAE. Our services include CFRP strengthening, concrete jacketing, crack injection, chemical grouting, waterproofing, and protective coatings. Our engineering and technical teams focus on quality, safety, and practical solutions tailored to project requirements.


r/Contractor • • 2d ago

Precon Handoff to Ops

3 Upvotes

I’ve been looking at our processes lately and feel like we could do better in the handoff from precon to ops. Any tricks or pointers out there that seem to work particularly well for you? We just collect a folder in a shared drive with scope/ contract and conversations with GC then schedule a meeting to review.


r/Contractor • • 2d ago

Business Development California [contractors/landlords] energy efficiency renovation payback from utility/city governments? How long does it take

1 Upvotes

There are a lot of energy incentive programs across CA through the utility programs, and I'm wondering if building owners know of these services and/or have used them?

I'm not finding much online about the volume, the timelines, or how long it takes to get the incentive rebate.

In short, if you're already renovating a multifamily property and your utilities come from specific natural gas or electric companies, you can get money back on what you spend on the renovation. That applies if you do things to make it more energy efficient and meet the guidelines, such as certain kinds of insulation or more energy-efficient HVAC equipment.

-------------------------------------------------------------------------------------------------

(Why I'm asking: I'm a new energy engineer who worked for a firm that solely applied to all the different incentive programs in New York City on behalf of building owners. I'm considering a move to California, and I'm just curious about the energy landscape there. It seems like the California government and utility companies may be ahead of New York, so firms that apply to the incentives on behalf of building owners might not exist, because the government already takes care of it. Just wondering if there are firms like that in California.

To be fair, I only got through training at the firm in New York before no longer working there, so I never got to work on any real projects. However, during that time, I did training at NOAA on Long Island NY, and the only other people who do training there are HVAC techs. I did get some HVAC tech certifications even as an engineer, so please don't shoot me for not being a contractor per se)


r/Contractor • • 2d ago

Everyone wants high-end work until they see the price tag.

300 Upvotes

Customers want premium composite decks, full remodels, all new siding and windows, etc., and then get sticker shock when they receive the quote.

Do people expect contractors to work for free or minimum wage? You understand you’re paying for both the materials AND the skilled labor required to install them, right?

Not to mention insurance, tools, equipment, overhead, and the responsibility of standing behind our work.

Everyone wants quality craftsmanship, professionalism, reliability, and experience, but apparently expecting to be compensated accordingly is asking too much.

It’s exhausting.

for context, I am a one-man business with low overhead. I always try to be fair with my pricing, but at the same time I know I bring quality work, and my reviews show that. It’s funny because today I got a 4 star review “fast, efficient, professional, great carpentry skills” but in the same breath they said ”I’m overpriced”.

This is the crap I’m talking about. You can’t have your cake and eat it too.


r/Contractor • • 3d ago

Pay employees in cash?

1 Upvotes

Hello, I am currently on the process of getting a roofing license. I want to keep things legal a d follow the rules. But there is something I still dont understand. A lot of the people i work with get paid cash and get a 1099 at the end of the year. Im doing a Google search and Google says that is illegal, that an independentcontractormust have a license to get a 1099. But every person I meet that could be a potential employee wants cash (many of them dont have papers) and i have no problem with reporting the income and showing i paid them but I also dont want to be in trouble.

Is there any experienced contractors that know how that works? Are there penalties or is the licensed contractor ultimately responsible for the taxes of the cash paid?

Before I had a ssn I also got cash and my boss also gave .e a 1099 at the end of the year so it seems very common, but i want to make sure it is not an issue.


r/Contractor • • 3d ago

San Diego piece work

0 Upvotes

I’m just starting out again after a few years w-2 and wondering what the going rate was for piece work.
Linear ft of base and or case if it’s a different price.
Towel bars and tp holders.
Per door install price
How do you typically price cabinets? Is it by the linear foot or per box

I’ve had my license for 10 years (general B) but moved to San Diego and wanted to work for someone to start building my contacts first

Thanks in advance


r/Contractor • • 3d ago

Tile Cutter Xmas Gift Help Needed!

2 Upvotes

Hi Contractors! I’d really love your help. My dad is an incredible handyman, and well on his way to being a professional contractor. He’s done incredible work for a ton of companies in the area, and tile work has become a huge passion. He’s worked tirelessly tiling my home (and my siblings homes), but he’s always borrowed tools from the tile company in their down time. I’d love to gift him a wet tile cutter for Christmas, and it would be ideal for it to be professional grade. Do you have any recommendations for me?


r/Contractor • • 3d ago

My first time seeing one of these, plumbers can go crazy now I guess?

Post image
17 Upvotes

r/Contractor • • 3d ago

Roofing Nails Visible

Thumbnail
gallery
5 Upvotes

I am in the process of buying a home and we asked for several shingles to be secured better. At the next walkthrough i took a closer look at the roof and noticed 10 visible nails. Is this normal and proper? Should I ask them to cover these nails with a roofing sealant?


r/Contractor • • 3d ago

Best Of How do you know when a foundation actually needs professional repair?

1 Upvotes

Dealing with shifting clay soil in central texas made me paranoid about every tiny hairline fracture in my drywall. After living through a major house leveling project last fall, I learned that cosmetic settling looks very different from structural movement.

Signs that actually warrant a structural inspection:

1. Diagonal drywall cracks radiating from door frames or window corners

2. Sticking doors and windows that suddenly refuse to latch properly

3. Sloping floors or noticeable gaps forming between baseboards and flooring

When I finally called for quotes, gl hunt gave me a quick walk through, while Above All Foundation Repair took elevation readings across the entire slab and explained the exact pier placement without high pressure sales tactics. Having a written estimate before committing saved me thousands in unnecessary work.

If you have dealt with slab settlement or pier and beam issues, what was the first warning sign that made you call a pro?


r/Contractor • • 3d ago

How are you guys handling takeoffs when you're bidding a lot of jobs a month?

6 Upvotes

been running my trade business a little over 8 years, decent size crew, usually a lot of bids out of once, estimating has always been the part that eats us alive

we were on buildertrend for about 8 months. good for scheduling and the client side, no complaints there. but takeoffs and estimates were still manual for us, so every bid meant someone sitting with the plans measuring and building it line by line. at our volume that was a lot of hours every week that nobody was getting paid for

a buddy who runs his own crew got me to try handoff ai for estimating, which does the takeoff with ai. you upload the plans and it comes back marked up with a list of what it assumed. took getting used to, and we still check every one because it's not perfect, sometimes it guesses on stuff that isn't clear on the plans. but checking a takeoff is way faster than doing one from scratch

the other thing that surprised me was how much we were losing on card fees and waiting days on payouts. didnt really add it up until we switched

curious what everyone else does though:

still doing takeoffs by hand, or using software? if software, does it hold up on messy plans? anyone found one tool that does estimating AND scheduling well, or does everyone end up with two?